Author: Ott, K.
Paper Title Page
TUPOW034 Status Report of the Berlin Energy Recovery Linac Project BERLinPro 1827
 
  • M. Abo-Bakr, W. Anders, K.B. Bürkmann-Gehrlein, A.B. Büchel, P. Echevarria, A. Frahm, H.-W. Glock, F. Glöckner, F. Göbel, B.D.S. Hall, S. Heling, H.-G. Hoberg, A. Jankowiak, C. Kalus, T. Kamps, G. Klemz, J. Knobloch, J. Kolbe, G. Kourkafas, J. Kühn, B.C. Kuske, P. Kuske, J. Kuszynski, D. Malyutin, A.N. Matveenko, M. McAteer, A. Meseck, C.J. Metzger-Kraus, R. Müller, A. Neumann, N. Ohm, K. Ott, E. Panofski, F. Pflocksch, J. Rahn, J. Rudolph, M. Schmeißer, O. Schüler, M. Schuster, J. Ullrich, A. Ushakov, J. Völker
    HZB, Berlin, Germany
 
  Funding: Work supported by the German Bundesministerium für Bildung und Forschung, Land Berlin and grants of Helmholtz Association
The Helmholtz Zentrum Berlin is constructing the Energy Recovery Linac Prototype BERLinPro at the Berlin Adlershof site. The project is intended to expand the required accelerator physics and technology knowledge mandatory for the design, construction and operation of future synchrotron light sources. The project goal is the generation of a high current (100 mA), high brilliance (norm. emittance below 1 mm mrad) cw electron beam. We report on the project progress: since spring 2015 the building is under construction, ready for occupancy in January 2017. The planning phase for the first project stage is completed for the warm machine parts, the SRF gun and partly for the SRF booster. Most of the components have been ordered and are in fabrication with some already delivered. An update of the status of the various subprojects as well as a summary of future activities will be given. Project milestones and details of the timeline will be reviewed.
 
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-TUPOW034  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPOW009 The Bessy Vsr Project for Short X-Ray Pulse Production 2833
 
  • A. Jankowiak, W. Anders, T. Atkinson, H. Ehmler, A. Föhlisch, P. Goslawski, K. Holldack, J. Knobloch, P. Kuske, D. Malyutin, A.N. Matveenko, R. Müller, A. Neumann, K. Ott, M. Ries, M. Ruprecht, A. Schälicke, A.V. Vélez, G. Wüstefeld
    HZB, Berlin, Germany
  • A. Burrill
    SLAC, Menlo Park, California, USA
 
  Funding: Work supported by the German Bundesministerium für Bildung und Forschung, Land Berlin and grants of the Helmholtz Association
HZB has started the innovative project, BESSY VSR, to upgrade the 1.7 GeV synchrotron radiation source BESSY II. Its goal is to provide both 1.7 ps and 15 ps long, intense X-ray pulses simultaneously at all beam lines. These pulses are generated by enhanced longitudinal bunch focusing using superconducting 5-cell cavities operating at 1.5 GHz and 1.75 GHz. The resulting beating of the voltages creates alternating long and short buckets that can be custom filled. As a first major step, prototype superconducting cavities, initially only cooled to 4.4 K and thus operating at reduced voltage, will be installed into the BESSY II storage ring. Physical and technical aspects of this proposal where recently studied* and the results and project status are presented.
* A. Jankowiak, J. Knobloch for the BESSY VSR team, Technical Design Study BESSY VSR, doi:10.5442/R0001, Helmholtz-Zentrum Berlin (Germany), June 2015.
 
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-WEPOW009  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)