Author: Neumann, A.
Paper Title Page
MOPOR033 Simulations of Dark Current from the BERLinPro Booster Module 671
 
  • M. McAteer, M. Abo-Bakr, B.C. Kuske, A. Neumann
    HZB, Berlin, Germany
 
  Funding: Work supported by the German Bundesministerium f\"ur Bildung und Forschung, Land Berlin and grants of Helmholtz Association
Dark current emitted from the surface of high-field RF cavities can contribute to radiation levels and cryo budget and can cause damage to sensitive accelerator components such as the photocathode. The superconducting niobium cavities in the booster module of BERLinPro will have surface fields strong enough to produce significant dark current from field emission, so simulations were made using Astra to track the propagation of emitted electrons from the surfaces of the cavities to examine the effects of dark current in the BERLinPro injector. Results of these simulations, including optimization of the layout to reduce propagation of electrons to the cathode and an estimation of power from dark current deposited throughout the injector, are presented.
 
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-MOPOR033  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPOW033 Status of the BERLinPro Main Linac Module 1823
 
  • H.-W. Glock, A. Frahm, J. Knobloch, A. Neumann
    HZB, Berlin, Germany
 
  Funding: Work supported by German Bundesministerium für Bildung und Forschung, Land Berlin, and grants of the Helmholtz Association
Beam operation of the BERLinPro energy recovery linac project, whose construction is under way, will initially start using the photoinjector and booster modules. In a second step the recirculation beam line and the main linac module will be added. Here the current design status of the main linac module is described. Results of wake field simulations are compared for different set ups. We also report on the manufacturing aspects including the design of the waveguide groups needed for HOM damping and the choice of flange-gasket-pairings appropriate for rectangular waveguides. Also mechanical considerations are included.
 
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-TUPOW033  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPOW034 Status Report of the Berlin Energy Recovery Linac Project BERLinPro 1827
 
  • M. Abo-Bakr, W. Anders, K.B. Bürkmann-Gehrlein, A.B. Büchel, P. Echevarria, A. Frahm, H.-W. Glock, F. Glöckner, F. Göbel, B.D.S. Hall, S. Heling, H.-G. Hoberg, A. Jankowiak, C. Kalus, T. Kamps, G. Klemz, J. Knobloch, J. Kolbe, G. Kourkafas, J. Kühn, B.C. Kuske, P. Kuske, J. Kuszynski, D. Malyutin, A.N. Matveenko, M. McAteer, A. Meseck, C.J. Metzger-Kraus, R. Müller, A. Neumann, N. Ohm, K. Ott, E. Panofski, F. Pflocksch, J. Rahn, J. Rudolph, M. Schmeißer, O. Schüler, M. Schuster, J. Ullrich, A. Ushakov, J. Völker
    HZB, Berlin, Germany
 
  Funding: Work supported by the German Bundesministerium für Bildung und Forschung, Land Berlin and grants of Helmholtz Association
The Helmholtz Zentrum Berlin is constructing the Energy Recovery Linac Prototype BERLinPro at the Berlin Adlershof site. The project is intended to expand the required accelerator physics and technology knowledge mandatory for the design, construction and operation of future synchrotron light sources. The project goal is the generation of a high current (100 mA), high brilliance (norm. emittance below 1 mm mrad) cw electron beam. We report on the project progress: since spring 2015 the building is under construction, ready for occupancy in January 2017. The planning phase for the first project stage is completed for the warm machine parts, the SRF gun and partly for the SRF booster. Most of the components have been ordered and are in fabrication with some already delivered. An update of the status of the various subprojects as well as a summary of future activities will be given. Project milestones and details of the timeline will be reviewed.
 
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-TUPOW034  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPOW035 First LLRF Tests of BERLinPro Gun Cavity Prototype 1831
 
  • P. Echevarria, J. Knobloch, O. Kugeler, A. Neumann, A. Ushakov
    HZB, Berlin, Germany
  • K.P. Przygoda
    DESY, Hamburg, Germany
 
  The goal of Berlin Energy Recovery Linac Project (BERLinPro) is the generation of a 50 MeV, 100-mA low emittance (below 1 mm mrad) CW electron beam at 2 ps rms bunch duration or below. Three different types of 1.3 GHz SRF modules will be employed: the electron gun, the booster and the main linac. Precise RF amplitude and phase control are needed due to the beam recovery pro-cess. In this paper we describe the first tests of the Low Level RF control of the first injector prototype at the HoBiCaT facility, implemented in the digital VME-based LLRF controller developed by Cornell University. Tuner movement control by an mTCA.4 system, together with further plans of using this technology will be also presented.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-TUPOW035  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPOW007 Status and Prospects of the BESSY II Injector System 2826
 
  • T. Atkinson, W. Anders, P. Goslawski, A. Jankowiak, F. Kramer, P. Kuske, D. Malyutin, A.N. Matveenko, A. Neumann, M. Ries, M. Ruprecht, A. Schälicke, T. Schneegans, D. Schüler, P.I. Volz, G. Wüstefeld
    HZB, Berlin, Germany
  • H.G. Glass
    BESSY GmbH, Berlin, Germany
 
  The BESSY II injector system consists of a 50 MeV Linac, installed in preparation for TopUp operation, and a 10 Hz fast-ramping booster synchrotron. The system provides injection efficiencies into the BESSY II storage ring well above 90 % . This contribution reports on the present status, measurements of energy acceptance and other essential beam parameters as well as studies on coupled-bunch-by-bunch instability. Requirements for BESSY-VSR and possible upgrade scenarios are discussed.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-WEPOW007  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPOW009 The Bessy Vsr Project for Short X-Ray Pulse Production 2833
 
  • A. Jankowiak, W. Anders, T. Atkinson, H. Ehmler, A. Föhlisch, P. Goslawski, K. Holldack, J. Knobloch, P. Kuske, D. Malyutin, A.N. Matveenko, R. Müller, A. Neumann, K. Ott, M. Ries, M. Ruprecht, A. Schälicke, A.V. Vélez, G. Wüstefeld
    HZB, Berlin, Germany
  • A. Burrill
    SLAC, Menlo Park, California, USA
 
  Funding: Work supported by the German Bundesministerium für Bildung und Forschung, Land Berlin and grants of the Helmholtz Association
HZB has started the innovative project, BESSY VSR, to upgrade the 1.7 GeV synchrotron radiation source BESSY II. Its goal is to provide both 1.7 ps and 15 ps long, intense X-ray pulses simultaneously at all beam lines. These pulses are generated by enhanced longitudinal bunch focusing using superconducting 5-cell cavities operating at 1.5 GHz and 1.75 GHz. The resulting beating of the voltages creates alternating long and short buckets that can be custom filled. As a first major step, prototype superconducting cavities, initially only cooled to 4.4 K and thus operating at reduced voltage, will be installed into the BESSY II storage ring. Physical and technical aspects of this proposal where recently studied* and the results and project status are presented.
* A. Jankowiak, J. Knobloch for the BESSY VSR team, Technical Design Study BESSY VSR, doi:10.5442/R0001, Helmholtz-Zentrum Berlin (Germany), June 2015.
 
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-WEPOW009  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)