Author: Matsumoto, S.
Paper Title Page
THPOR041 High Gradient Properties of a CLIC Prototype Accelerating Structure made by Tsinghua University 3874
 
  • X.W. Wu, H.B. Chen, J. Shi
    TUB, Beijing, People's Republic of China
  • T. Higo, S. Matsumoto
    KEK, Ibaraki, Japan
  • W. Wuensch
    CERN, Geneva, Switzerland
 
  A CLIC prototype structure, T24_THU_#1, was recently high-gradient tested at KEK X-band test stand, Nextef. The copper parts of this 24-cell TW structure were delivered from CERN, were bonded and brazed, bench-tested and tuned in Tsinghua University. The aim of this test was not only to verify the cavity high-gradient properties under 100 MV/m but also to study the breakdown phenomenon in high gradient. High power test results were presented and breakdown rate under 100 MV/m was compared to previously-tested CLIC prototype structures. The assembly capability of Tsinghua University for X-band high gradient structures was validated by the good high gradient performance of T24_THU_#1.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-THPOR041  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPOY027 Commissioning Status of SuperKEKB Injector Linac 4152
 
  • M. Satoh, M. Akemoto, D.A. Arakawa, Y. Arakida, A. Enomoto, Y. Enomoto, S. Fukuda, Y. Funakoshi, K. Furukawa, T. Higo, H. Honma, N. Iida, M. Ikeda, H. Iwase, H. Kaji, K. Kakihara, T. Kamitani, H. Katagiri, S. Kazama, M. Kikuchi, H. Koiso, S. Matsumoto, T. Matsumoto, H. Matsushita, S. Michizono, K. Mikawa, T. Mimashi, T. Miura, F. Miyahara, T. Mori, A. Morita, H. Nakajima, K. Nakao, T. Natsui, Y. Ogawa, Y. Ohnishi, S. Ohsawa, F. Qiu, I. Satake, D. Satoh, Y. Seimiya, T. Shidara, A. Shirakawa, M. Suetake, H. Sugimoto, T. Suwada, M. Tanaka, M. Tawada, Y. Yano, K. Yokoyama, M. Yoshida, R. Zhang, X. Zhou
    KEK, Ibaraki, Japan
 
  The SuperKEKB main ring is currently being constructed for aiming at the peak luminosity of 8 x 1035 cm-2s−1. The electron/positron injector linac upgrade is also going on for increasing the intensity of bunch charge with keeping the small emittance. The key upgrade issues are the construction of positron damping ring, a new positron capture system, and a low emittance photo-cathode rf electron source. The injector linac beam commissioning started in the October of 2013. In this paper, we report the present status and future plan of SuperKEKB injector commissioning.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-THPOY027  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)