Author: Marutsuka, K.
Paper Title Page
WEPOW020 Present Status of KEK Photon Factory and Future Project 2871
 
  • T. Honda, M. Adachi, S. Asaoka, K. Haga, K. Harada, Y. Honda, X.J. Jin, T. Kageyama, R. Kato, Y. Kobayashi, K. Marutsuka, T. Miyajima, H. Miyauchi, S. Nagahashi, N. Nakamura, K.N. Nigorikawa, T. Nogami, T. Obina, M. Ono, T. Ozaki, H. Sagehashi, H. Sakai, S. Sakanaka, H. Sasaki, Y. Sato, M. Shimada, T. Shioya, M. Tadano, T. Tahara, T. Takahashi, R. Takai, H. Takaki, O. Tanaka, Y. Tanimoto, K. Tsuchiya, T. Uchiyama, A. Ueda, K. Umemori, K. Watanabe, M. Yamamoto, N. Yamamoto, Ma. Yoshida, S.I. Yoshimoto
    KEK, Ibaraki, Japan
 
  Two synchrotron radiation sources of KEK, the PF-ring and the PF-AR, continue their user operation with various improvements. Scrap and build of the first generation undulators of 1980s at the PF-ring is pushed forward year by year. Five new elliptically polarized undulators have been installed in these five years, and we have also installed four very narrow-gap short-period undulators generating high brilliant X-ray. The new beam transport line that enables the 6.5-GeV full energy injection for PF-AR will be completed by the end of 2016 in order to make the top-up operation of the two SR sources compatible with the continuous injection for two main rings of the Super-KEKB. We have proposed a project of further upgrade of the 2.5-GeV PF-ring to improve its horizontal emittance as 8 nm rad using combined bending magnets at the arc sections. And we are also moving ahead on proposal of constructing a new KEK light source of an extremely low emittance as 0.3 nm rad. The progress and detail of our future project will be described in this paper.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-WEPOW020  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)