Author: Kurimoto, Y.
Paper Title Page
THPMW002 Power Supplies for Main Magnet of J-PARC Main Ring 3534
 
  • S. Nakamura, Y. Kurimoto, Y. Morita, T. Shimogawa
    KEK, Ibaraki, Japan
 
  A large magnetic field ripple of the order of 10-2 were observed at the first beam commissioning of J-PARC main ring in 2008, To eliminate the ripple, we had improved the magnet power supplies by reconstructing a trap-filter of 600 Hz and adopting an additional DCCT. We made differencial circuit and symmetrical wiring for all magnets. On the other hand, acceleration period was reduced from 2.5 s to 1.4 s for increasing the beam power with feedforward control. We summarize the improvements of the magnet power supplies in this paper.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-THPMW002  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)