Author: Korenev, I.E.
Paper Title Page
THPOR018 Comissioning of Upgraded VEPP-2000 Injection Chain 3811
 
  • D.E. Berkaev, A.V. Andrianov, K.V. Astrelina, V.V. Balakin, A.M. Barnyakov, O.V. Belikov, M.F. Blinov, D.V. Bochek, D. Bolkhovityanov, F.A. Emanov, A.R. Frolov, K. Gorchakov, Ye.A. Gusev, A.S. Kasaev, E. Kenzhbulatov, I. Koop, I.E. Korenev, G.Y. Kurkin, N.N. Lebedev, A.E. Levichev, P.V. Logatchov, A.P. Lysenko, D.A. Nikiforov, V.P. Prosvetov, Yu. A. Rogovsky, S.L. Samoylov, A.I. Senchenko, P.Yu. Shatunov, Y.M. Shatunov, D.B. Shwartz, A.A. Starostenko, I.M. Zemlyansky, Yu.M. Zharinov
    BINP SB RAS, Novosibirsk, Russia
  • F.A. Emanov, Yu. A. Rogovsky, A.I. Senchenko, A.A. Starostenko
    NSU, Novosibirsk, Russia
 
  The upgrade of VEPP-2000 e+e collider injection chain includes the connection to BINP Injection Complex (IC) via newly constructed transfer line K-500 as well as upgrade of the booster synchrotron BEP to the energy of 1 GeV. Modernization has started in the middle of 2013 and now the electron and positron beams with highly increased production rate together with top-up injection from BEP are ready to feed VEPP-2000 ring and provide design luminosity at the whole energy range limited only by beam-beam effects. The design and operation experience of IC damping ring, 250 m transfer channel and booster BEP dealing with 2.6 T magnets at top energy will be presented.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-THPOR018  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)