TUPOW034 Status Report of the Berlin Energy Recovery Linac Project BERLinPro 1827
 
  • M. Abo-Bakr, W. Anders, K.B. Bürkmann-Gehrlein, A.B. Büchel, P. Echevarria, A. Frahm, H.-W. Glock, F. Glöckner, F. Göbel, B.D.S. Hall, S. Heling, H.-G. Hoberg, A. Jankowiak, C. Kalus, T. Kamps, G. Klemz, J. Knobloch, J. Kolbe, G. Kourkafas, J. Kühn, B.C. Kuske, P. Kuske, J. Kuszynski, D. Malyutin, A.N. Matveenko, M. McAteer, A. Meseck, C.J. Metzger-Kraus, R. Müller, A. Neumann, N. Ohm, K. Ott, E. Panofski, F. Pflocksch, J. Rahn, J. Rudolph, M. Schmeißer, O. Schüler, M. Schuster, J. Ullrich, A. Ushakov, J. Völker
    HZB, Berlin, Germany
 
  Funding: Work supported by the German Bundesministerium für Bildung und Forschung, Land Berlin and grants of Helmholtz Association
The Helmholtz Zentrum Berlin is constructing the Energy Recovery Linac Prototype BERLinPro at the Berlin Adlershof site. The project is intended to expand the required accelerator physics and technology knowledge mandatory for the design, construction and operation of future synchrotron light sources. The project goal is the generation of a high current (100 mA), high brilliance (norm. emittance below 1 mm mrad) cw electron beam. We report on the project progress: since spring 2015 the building is under construction, ready for occupancy in January 2017. The planning phase for the first project stage is completed for the warm machine parts, the SRF gun and partly for the SRF booster. Most of the components have been ordered and are in fabrication with some already delivered. An update of the status of the various subprojects as well as a summary of future activities will be given. Project milestones and details of the timeline will be reviewed.
 
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-TUPOW034  