Author: Jensen, L.K.
Paper Title Page
MOPMR027 Employing Beam-Gas Interaction Vertices for Transverse Profile Measurements 296
SUPSS073   use link to see paper's listing under its alternate paper code  
 
  • M.N. Rihl, A. Alexopoulos, V. Baglin, C. Barschel, E. Bravin, G. Bregliozzi, N. Chritin, B. Dehning, M. Ferro-Luzzi, C. Gaspar, M. Giovannozzi, R. Jacobsson, L.K. Jensen, O.R. Jones, N.J. Jurado, V. Kain, M. Kuhn, B. Luthi, P. Magagnin, R. Matev, N. Neufeld, J. Panman, V. Salustino Guimaraes, B. Salvant, R. Veness, S. Vlachos
    CERN, Geneva, Switzerland
  • A. Bay, F. Blanc, S. Gianì, G.J. Haefeli, P. Hopchev, T. Nakada, B. Rakotomiaramanana, O. Schneider, M. Tobin, Q.D. Veyrat, Z. Xu
    EPFL, Lausanne, Switzerland
  • R. Greim, W. Karpinski, T. Kirn, S. Schael, G. Schwering, M. Wlochal, A. von Dratzig
    RWTH, Aachen, Germany
 
  Interactions of high-energy beam particles with residual gas offer a unique opportunity to measure the beam profile in a non-intrusive fashion. Such a method was successfully pioneered* at the LHCb experiment using a silicon microstrip vertex detector. During the recent Large Hadron Collider shutdown at CERN, a demonstrator Beam-Gas Vertexing system based on eight scintillating-fibre modules was designed**, constructed and installed on Ring 2 to be operated as a pure beam diagnostics device. The detector signals are read out and collected with LHCb-type front-end electronics and a DAQ system consisting of a CPU farm. Tracks and vertices will be reconstructed to obtain a beam profile in real time. Here, first commissioning results are reported. The advantages and potential for future applications of this technique are discussed.
* LHCb collaboration, Journal of Instrumentation, 9, P12005
** P. Hopchev in Proc. of IPAC 2014, June 15-20, 2014, Dresden Germany
 
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-MOPMR027  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPMR052 Commissioning Preparation of the AWAKE Proton Beam Line 1374
 
  • J.S. Schmidt, B. Biskup, C. Bracco, B. Goddard, R. Gorbonosov, M. Gourber-Pace, E. Gschwendtner, L.K. Jensen, O.R. Jones, V. Kain, S. Mazzoni, M. Meddahi
    CERN, Geneva, Switzerland
 
  The AWAKE experiment at CERN will use a proton bunch with an momentum of 400 GeV/c from the SPS to drive large amplitude wakefields in a plasma. This will require a ~830 m long transfer line from the SPS to the experiment. The prepa- rations for the beam commissioning of the AWAKE proton transfer line are presented in this paper. They include the detailed planning of the commissioning steps, controls and beam instrumentation specifications as well as operational tools, which are developed for the steering and monitoring of the beam line. The installation of the transfer line has been finished and first beam is planned in summer 2016.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-TUPMR052  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)