Author: Jansson, A.
Paper Title Page
MOPMR020 Beam Diagnostics for ESS Commissioning and Early Operation 273
 
  • A. Jansson, M. Eshraqi, S. Molloy
    ESS, Lund, Sweden
 
  The ESS linac design has evolved over time and is now quite stable. Recently, there has been a focused effort on developing more detailed installation and commissioning plan, and related to this, the plans for diagnostics has also been reviewed. This paper presents the updated diagnos-tics suite. Many of diagnostics systems will be developed by in-kind partners across Europe.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-MOPMR020  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPOY045 ESS Linac Beam Physics Design Update 947
 
  • M. Eshraqi, H. Danared, R. De Prisco, A. Jansson, Y.I. Levinsen, M. Lindroos, R. Miyamoto, M. Muñoz, A. Ponton
    ESS, Lund, Sweden
 
  The European Spallation Source, ESS, uses a linear accelerator to bombard the tungsten target with the high intensity protons beam for producing intense beams of neutrons. The nominal average beam power of the linac is 5~MW with a peak beam power at target of 125~MW. This paper focuses on the beam dynamics design of the ESS linac and the diagnostics elements used for the tuning of the lattice and matching between sections.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-MOPOY045  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
FRYAA02 ESS Progressing into Construction 4266
 
  • M. Lindroos, H. Danared, M. Eshraqi, R. Garoby, A. Jansson, Y.I. Levinsen, C.A. Martins, A. Ponton
    ESS, Lund, Sweden
 
  The construction of the European Spallation Source, ESS, started in summer 2014. At the site in Lund, the accelerator tunnel will be completed at the time of IPAC16, while prototyping and manufacturing or prepara-tions for manpower contributions are going on in more 23 laboratories distributed over the 12 European countries collaborating on the accelerator project. Major technical milestones have been reached include the testing of su-perconducting cavity prototypes of two families to values above design gradients, the first ESS modulator has been tested to 90 kV and the first klystron prototype has been received in April 2016. Equally important developments are taking place at many partner laboratories. The presen-tation will summarize the status of the ESS accelerator project by the time of IPAC16..  
slides icon Slides FRYAA02 [66.734 MB]  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-FRYAA02  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)