Author: Honda, T.
Paper Title Page
TUPOW036 Recent Developments and Operational Status of the Compact ERL at KEK 1835
 
  • T. Obina, M. Adachi, S. Adachi, T. Akagi, M. Akemoto, D.A. Arakawa, S. Araki, S. Asaoka, M. Egi, K. Enami, K. Endo, S. Fukuda, T. Furuya, K. Haga, K. Hara, K. Harada, T. Honda, Y. Honda, H. Honma, T. Honma, K. Hosoyama, K. Hozumi, A. Ishii, X.J. Jin, E. Kako, Y. Kamiya, H. Katagiri, R. Kato, H. Kawata, Y. Kobayashi, Y. Kojima, Y. Kondo, T. Konomi, A. Kosuge, T. Kume, T. Matsumoto, H. Matsumura, H. Matsushita, S. Michizono, T. Miura, T. Miyajima, H. Miyauchi, S. Nagahashi, H. Nakai, H. Nakajima, N. Nakamura, K. Nakanishi, K. Nakao, K.N. Nigorikawa, T. Nogami, S. Noguchi, S. Nozawa, T. Ozaki, F. Qiu, H. Sagehashi, H. Sakai, S. Sakanaka, S. Sasaki, K. Satoh, Y. Seimiya, T. Shidara, M. Shimada, K. Shinoe, T. Shioya, T. Shishido, M. Tadano, T. Tahara, T. Takahashi, R. Takai, H. Takaki, T. Takenaka, O. Tanaka, Y. Tanimoto, N. Terunuma, M. Tobiyama, K. Tsuchiya, T. Uchiyama, A. Ueda, K. Umemori, J. Urakawa, K. Watanabe, M. Yamamoto, N. Yamamoto, Y. Yamamoto, Y. Yano, M. Yoshida
    KEK, Ibaraki, Japan
  • R. Hajima, M. Mori, R. Nagai, N. Nishimori, M. Sawamura, T. Shizuma
    QST, Tokai, Japan
  • M. Kuriki
    Hiroshima University, Graduate School of Science, Higashi-Hiroshima, Japan
 
  The Compact Energy Recovery Linac (cERL) at KEK is a test accelerator in order to develop key components to realize remarkable ERL performance as a future light source. After the beam commissioning in December 2013, the legal current limit has been increased step-by-step like 1 uA, 10 uA, and 100 uA. Survey for the source of beam losses has been conducted in each step, and the study on beam dynamics and tuning has also been carried out. As a next step, 1 mA operation is scheduled in February 2016. In parallel to the increase in beam current, a laser Compton scattering (LCS) system which can provide high-flux X-ray to a beamline has been successfully commissioned. We report recent progress in various kinds of beam tuning: improvement of electron gun performance, high bunch charge operation, mitigation of beam losses, LCS optics tuning and bunch compression for THz radiation.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-TUPOW036  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPOW020 Present Status of KEK Photon Factory and Future Project 2871
 
  • T. Honda, M. Adachi, S. Asaoka, K. Haga, K. Harada, Y. Honda, X.J. Jin, T. Kageyama, R. Kato, Y. Kobayashi, K. Marutsuka, T. Miyajima, H. Miyauchi, S. Nagahashi, N. Nakamura, K.N. Nigorikawa, T. Nogami, T. Obina, M. Ono, T. Ozaki, H. Sagehashi, H. Sakai, S. Sakanaka, H. Sasaki, Y. Sato, M. Shimada, T. Shioya, M. Tadano, T. Tahara, T. Takahashi, R. Takai, H. Takaki, O. Tanaka, Y. Tanimoto, K. Tsuchiya, T. Uchiyama, A. Ueda, K. Umemori, K. Watanabe, M. Yamamoto, N. Yamamoto, Ma. Yoshida, S.I. Yoshimoto
    KEK, Ibaraki, Japan
 
  Two synchrotron radiation sources of KEK, the PF-ring and the PF-AR, continue their user operation with various improvements. Scrap and build of the first generation undulators of 1980s at the PF-ring is pushed forward year by year. Five new elliptically polarized undulators have been installed in these five years, and we have also installed four very narrow-gap short-period undulators generating high brilliant X-ray. The new beam transport line that enables the 6.5-GeV full energy injection for PF-AR will be completed by the end of 2016 in order to make the top-up operation of the two SR sources compatible with the continuous injection for two main rings of the Super-KEKB. We have proposed a project of further upgrade of the 2.5-GeV PF-ring to improve its horizontal emittance as 8 nm rad using combined bending magnets at the arc sections. And we are also moving ahead on proposal of constructing a new KEK light source of an extremely low emittance as 0.3 nm rad. The progress and detail of our future project will be described in this paper.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-WEPOW020  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPMB012 The HMBA Lattice Optimization for the New 3 GeV Light Source 3251
 
  • K. Harada, M. Adachi, N. Funamori, T. Honda, Y. Kobayashi, N. Nakamura, K. Oide, H. Sakai, S. Sakanaka, K. Tsuchiya
    KEK, Ibaraki, Japan
 
  For the design study of the HMBA (hybrid multi bend achromat) type most advanced light source, the new storage ring was designed from the lattice of the phase II upgrade project of the ESRF (ESRF II). Although the original 3 GeV test lattice from Dr. Pantaleo Raimondi of ESRF has no problem about the optical and magnetic parameters including the dynamic aperture, we reduce the cell numbers and inserted the short straight sections for the in-vacuum short-gap undulators. After the optimization of the linear and non-linear optics as the original design principle of ESRF II, the altered lattice has the circumference of about 440 m with 16 HMBA cells, the emittance about 440 pm rad with the intra-beam scattering effect at the beam current of 500 mA, and the large dynamic aperture of about 2 cm at the injection point even with the usual magnetic errors.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-THPMB012  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)