Author: Hellwig, A.
Paper Title Page
WEPOW012 Hardware Upgrades Improve the Reliability at BESSY II 2844
 
  • A. Schälicke, W. Anders, J. Borninkhof, V. Dürr, P. Goslawski, A. Hellwig, A. Heugel, H.-G. Hoberg, H. Hoffmann, A. Jankowiak, J. Kolbe, P. Kuske, G. Mielczarek, R. Müller, D. Pflückhahn, M. Ries, S. Rotterdam, M. Ruprecht, B. Schriefer, D. Simmering, H. Stein
    HZB, Berlin, Germany
 
  The synchrotron light source BESSY II is now in its second decade of operation. Already in 2013 both top-up and fast orbit feedback have been introduced into user operation. Currently, the facility is undergoing significant hardware upgrades in order to fulfill the increasing demands of its user community in terms of reliability, stability and flexibility. These include replacement of the DORIS cavities with EU HOM damped cavities, the upgrade of the RF transmitters to solid state amplifiers, implementation of the shifted waist optics for the new in-vacuum undulator, and refurbishment of the superconducting multi-pole wiggler. In this contribution status of BESSY II operation and the upgrade projects is reported.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-WEPOW012  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)