Author: Gougnaud, F.
Paper Title Page
MOPOY053 The SARAF-LINAC Project Status 971
 
  • N. Pichoff, N. Bazin, L. Boudjaoui, P. Brédy, D. Chirpaz-Cerbat, R. Cubizolles, B. Dalena, G. Ferrand, B. Gastineau, P. Gastinel, P. Girardot, F. Gougnaud, P. Hardy, M. Jacquemet, F. Leseigneur, C. Madec, N. Misiara, P.A.P. Nghiem, D. Uriot
    CEA/IRFU, Gif-sur-Yvette, France
  • P. Bertrand, M. Di Giacomo, R. Ferdinand, J.-M. Lagniel, J.F. Leyge, M. Michel
    GANIL, Caen, France
 
  SNRC and CEA collaborate to the upgrade of the SARAF accelerator to 5 mA CW 40 MeV deuteron and proton beams (Phase 2). CEA is in charge of the design, construction and commissioning of the superconducting linac (SARAF-LINAC Project). This paper presents to the accelerator community the status at March 2016 of the SARAF-LINAC Project.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-MOPOY053  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)