Author: Gorbonosov, R.
Paper Title Page
TUPMR052 Commissioning Preparation of the AWAKE Proton Beam Line 1374
 
  • J.S. Schmidt, B. Biskup, C. Bracco, B. Goddard, R. Gorbonosov, M. Gourber-Pace, E. Gschwendtner, L.K. Jensen, O.R. Jones, V. Kain, S. Mazzoni, M. Meddahi
    CERN, Geneva, Switzerland
 
  The AWAKE experiment at CERN will use a proton bunch with an momentum of 400 GeV/c from the SPS to drive large amplitude wakefields in a plasma. This will require a ~830 m long transfer line from the SPS to the experiment. The prepa- rations for the beam commissioning of the AWAKE proton transfer line are presented in this paper. They include the detailed planning of the commissioning steps, controls and beam instrumentation specifications as well as operational tools, which are developed for the steering and monitoring of the beam line. The installation of the transfer line has been finished and first beam is planned in summer 2016.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-TUPMR052  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)