FRYAA02 ESS Progressing into Construction 4266
 
  • M. Lindroos, H. Danared, M. Eshraqi, R. Garoby, A. Jansson, Y.I. Levinsen, C.A. Martins, A. Ponton
    ESS, Lund, Sweden
 
  The construction of the European Spallation Source, ESS, started in summer 2014. At the site in Lund, the accelerator tunnel will be completed at the time of IPAC16, while prototyping and manufacturing or prepara-tions for manpower contributions are going on in more 23 laboratories distributed over the 12 European countries collaborating on the accelerator project. Major technical milestones have been reached include the testing of su-perconducting cavity prototypes of two families to values above design gradients, the first ESS modulator has been tested to 90 kV and the first klystron prototype has been received in April 2016. Equally important developments are taking place at many partner laboratories. The presen-tation will summarize the status of the ESS accelerator project by the time of IPAC16..  
slides icon Slides FRYAA02 [66.734 MB]  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-FRYAA02  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)