Author: Gaio, G.
Paper Title Page
MOPOW015 Fermi Upgrade Plans 744
 
  • A. Fabris, E. Allaria, L. Badano, F. Bencivenga, C. Callegari, F. Capotondi, D. Castronovo, F. Cilento, P. Cinquegrana, M. Coreno, R. Cucini, I. Cudin, G. D'Auria, M.B. Danailov, R. De Monte, G. De Ninno, P. Delgiusto, A.A. Demidovich, S. Di Mitri, B. Diviacco, R. Fabris, W.M. Fawley, M. Ferianis, E. Ferrari, P. Finetti, P. Furlan Radivo, G. Gaio, D. Gauthier, F. Gelmetti, L. Giannessi, F. Iazzourene, M. Kiskinova, S. Krecic, M. Lonza, N. Mahne, M. Malvestuto, C. Masciovecchio, M. Milloch, F. Parmigiani, G. Penco, A. Perucchi, L. Pivetta, O. Plekan, M. Predonzani, E. Principi, L. Raimondi, P. Rebernik Ribič, F. Rossi, E. Roussel, L. Rumiz, C. Scafuri, C. Serpico, P. Sigalotti, M. Svandrlik, C. Svetina, M. Trovò, A. Vascotto, M. Veronese, R. Visintini, D. Zangrando, M. Zangrando
    Elettra-Sincrotrone Trieste S.C.p.A., Basovizza, Italy
 
  FERMI has reached its nominal performance on both FEL lines, FEL-1 (12 eV to 62 eV) and FEL-2 (62 eV to 310 eV). After a brief overview of the activities with users, we will describe plans for LINAC , FEL and beamline upgrades for 2016-2018 and beyond. This includes EEHG schemes for FEL-2.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-MOPOW015  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPMY042 Effective Cycling and Ramping 2651
 
  • Ł. Żytniak, Ł.J. Dudek, P.P. Goryl, A. Kisiel, W.T. Kitka, A.I. Wawrzyniak
    Solaris, Kraków, Poland
  • P.J. Bell, V.H. Hardion, D.P. Spruce
    MAX IV Laboratory, Lund University, Lund, Sweden
  • G. Gaio
    Elettra-Sincrotrone Trieste S.C.p.A., Basovizza, Italy
 
  The National Synchrotron Radiation Centre Solaris, Kraków, Poland has been successfully built in collaboration with several institutes and organizations. The MAX IV Laboratory, Lund, Sweden and Elettra, Trieste, Italy, are the most important synchrotron partners. Solaris has built as an adaptation of MAX-IV 1.5 GeV ring and linear accelerator based on the same components as the ones of MAX-IV, therefore the device server for the magnet circuit has been developed by MAX-IV. Ramping was included in expert consultancy services contract won by Elettra. Solving problem with the power supplies stability and thanks to usage snapshots as steps for ramping it was possible to ramp the beam without losing current linearly.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-WEPMY042  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)