Author: Chen, C.-T.
Paper Title Page
WEPMB052 System Integration and Beam Commissioning of the 500-MHz RF Systems for Taiwan Photon Source 2234
 
  • Ch. Wang, L.-H. Chang, M.H. Chang, C.-T. Chen, L.J. Chen, F.-T. Chung, M.-C. Lin, Z.K. Liu, C.H. Lo, G.-H. Luo, C.L. Tsai, H.H. Tsai, M.H. Tsai, M.-S. Yeh, T.-C. Yu
    NSRRC, Hsinchu, Taiwan
 
  The accelerator complex of the Taiwan Photon Source (TPS) consists of two 500-MHz RF systems: one RF system with two KEKB-type single-cell SRF modules is operated for the 3-GeV storage ring of circumference 518 m, and the other with one five-cell Petra cavity at room temperature is for the concentric full-energy booster synchrotron. This report overviews the installation, system integration, commissioning, and initial operation of the 500-MHz RF systems for the TPS with emphasis on our solution to approach the highly reliable SRF operation at its maximum design beam current of 500-mA. Lessons learned during the project are reviewed.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-WEPMB052  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)