Author: Chanlek, N.
Paper Title Page
WEPMY002 SLRI Beam Test Facility Development Project 2539
 
  • K. Kittimanapun, N. Chanlek, S. Cheedket, N. Juntong, P. Klysubun, S. Krainara, K. Sittisard, S. Supajeerapan
    SLRI, Nakhon Ratchasima, Thailand
 
  Funding: This work is supported by the National Science and Technology Development Agency (NSTDA) under contract FDA-C0-2558-855-TH.
The SLRI Beam Test Facility (SLRI BTF) is a part of the future upgrades of the SLRI accelerator complex. Upon completion, SLRI BTF will be able to produce electron test beams with the number of electrons ranging from a few to several thousand electrons per bunch. The project is divided into three stages based on the complexity of the electron reduction setups. The simple setup for the initial stage has been implemented without any modifications to the current high-energy beam transport line (HBT) while additional elements together with an existing 4-degree dipole are required for the short-term setup in the second stage. For the last stage, a new dedicated transfer line equipped with a high-resolution energy selector will be constructed to direct the electron beam from the HBT beam line to an experimental station. This project aims to provide a defined number of electrons with maximum energy of 1 GeV for calibration and testing of high energy detectors as well as other beam diagnostic instrumentations.
 
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-WEPMY002  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)