TUPMY041 Delivery Status of the ELI-NP Gamma Beam System 1635
 
  • S. Tomassini, D. Alesini, A. Battisti, R. Boni, F. Cioeta, A. Delle Piane, E. Di Pasquale, G. Di Pirro, A. Falone, A. Gallo, S.I. Incremona, V.L. Lollo, A. Mostacci, S. Pioli, R. Ricci, U. Rotundo, A. Stella, C. Vaccarezza, A. Vannozzi, A. Variola
    INFN/LNF, Frascati (Roma), Italy
  • A. Bacci, D.T. Palmer, L. Serafini
    Istituto Nazionale di Fisica Nucleare, Milano, Italy
  • N. Bliss
    STFC/DL, Daresbury, Warrington, Cheshire, United Kingdom
  • F. Cardelli
    INFN-Roma1, Rome, Italy
  • K. Cassou, Z.F. Zomer
    LAL, Orsay, France
  • G. D'Auria
    Elettra-Sincrotrone Trieste S.C.p.A., Basovizza, Italy
  • A. Giribono, V. Pettinacci
    INFN-Roma, Roma, Italy
  • C. Hill
    STFC/DL/ASTeC, Daresbury, Warrington, Cheshire, United Kingdom
  • L. Palumbo
    Rome University La Sapienza, Roma, Italy
  • L. Piersanti
    University of Rome La Sapienza, Rome, Italy
 
  The ELI-NP GBS is a high intensity and monochromatic gamma source under construction in Magurele (Romania). The design and construction of the Gamma Beam System complex as well as the integration of the technical plants and the commissioning of the overall facility, was awarded to the Eurogammas Consortium in March 2014. The delivery of the facility has been planned in for 4 stages and the first one was fulfilled in October 31st 2015. The engineering aspects related to the delivery stage 1 are presented.  