Author: Blinov, M.F.
Paper Title Page
THPMR031 Turn-by-Turn Measurements for Beam Dynamics at Vepp-5 Damping Ring 3452
 
  • M.F. Blinov, K.V. Astrelina, V.V. Balakin, O.I. Meshkov, A.A. Starostenko
    BINP SB RAS, Novosibirsk, Russia
  • V.L. Dorokhov
    BINP, Novosibirsk, Russia
 
  Preinjector complex VEPP-5 is being constructed for high rate production and acceleration of electrons and positrons beams up to energy 510 MeV. Both kinds of particles accumulated in the damping ring and after achieving of needed intensity the beams would be transported alternatively to VEPP-3/VEPP-4M or to BEP/VEPP-2000 colliders. At this paper basic parameters of damping ring presented. All measurements were carried out for electron beam with energy 385 MeV. For turn-by-turn measurements 12 beam position monitors were used. In order to improve precision of measured value NAFF algorithm was applied. For measurements of longitudinal beam profile optical phi-dissector was used.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-THPMR031  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPOR018 Comissioning of Upgraded VEPP-2000 Injection Chain 3811
 
  • D.E. Berkaev, A.V. Andrianov, K.V. Astrelina, V.V. Balakin, A.M. Barnyakov, O.V. Belikov, M.F. Blinov, D.V. Bochek, D. Bolkhovityanov, F.A. Emanov, A.R. Frolov, K. Gorchakov, Ye.A. Gusev, A.S. Kasaev, E. Kenzhbulatov, I. Koop, I.E. Korenev, G.Y. Kurkin, N.N. Lebedev, A.E. Levichev, P.V. Logatchov, A.P. Lysenko, D.A. Nikiforov, V.P. Prosvetov, Yu. A. Rogovsky, S.L. Samoylov, A.I. Senchenko, P.Yu. Shatunov, Y.M. Shatunov, D.B. Shwartz, A.A. Starostenko, I.M. Zemlyansky, Yu.M. Zharinov
    BINP SB RAS, Novosibirsk, Russia
  • F.A. Emanov, Yu. A. Rogovsky, A.I. Senchenko, A.A. Starostenko
    NSU, Novosibirsk, Russia
 
  The upgrade of VEPP-2000 e+e collider injection chain includes the connection to BINP Injection Complex (IC) via newly constructed transfer line K-500 as well as upgrade of the booster synchrotron BEP to the energy of 1 GeV. Modernization has started in the middle of 2013 and now the electron and positron beams with highly increased production rate together with top-up injection from BEP are ready to feed VEPP-2000 ring and provide design luminosity at the whole energy range limited only by beam-beam effects. The design and operation experience of IC damping ring, 250 m transfer channel and booster BEP dealing with 2.6 T magnets at top energy will be presented.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-THPOR018  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)