THPOY015 Control System Developments for the MYRRHA Linac 4116
 
  • R. Modic
    Cosylab, Ljubljana, Slovenia
  • J.-L. Biarrotte
    IPN, Orsay, France
  • D. Bondoux, F. Bouly
    LPSC, Grenoble Cedex, France
  • L. Medeiros Romão, D. Vandeplassche
    SCK•CEN, Mol, Belgium
 
  Funding: This work is being supported by the Euratom research and training programme 2014-2018 under grant agreement N°662186 (MYRTE project).
The goal of the MYRRHA project is to demonstrate the technical feasibility of transmutation in a 100 MWth Accelerator Driven System by building a new flexible irradiation complex in Mol (Belgium). The MYRRHA facility requires a 600 MeV linear accelerator delivering a maximum proton flux of 4 mA in continuous operation, with an additional requirement for exceptional reliability. The control system of the future MYRRHA linac will have an essential role to play in this extreme reliability scenario. On the one hand the intrinsic reliability of the entire control system must be ensured. On the other hand control system will have to take up very high level duties of complex decision taking. This paper summarizes the ongoing developments for the concept design of such a control system. The related experimental activities performed and planned around the MYRRHA injector platform (ECR ion source + LEBT + RFQ) will also be described.
 
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-THPOY015  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)