Author: Berkaev, D.E.
Paper Title Page
TUPMB017 The Injection Septum Magnet for the Collector Ring (FAIR) 1145
 
  • P.Yu. Shatunov, D.E. Berkaev, I. Koop, E.P. Semenov, D.B. Shwartz
    BINP SB RAS, Novosibirsk, Russia
  • A. Dolinskyy, S.A. Litvinov
    GSI, Darmstadt, Germany
  • Yu. A. Rogovsky
    Budker INP & NSU, Novosibirsk, Russia
 
  Collector Ring is one of the key installations of the FAIR project (Darmstadt, Germany). It is dedicated for stochastic cooling of incoming beams of antiprotons and rare ions. Additionally there is a mode of operation for experiments in the ring. Beams for all modes of operation are injected through one transfer channel. Extremely high acceptance of the ring (240 mm*mrad) leads to large apertures of all magnetic elements including the septum magnet. Meanwhile planned parameters of the magnetic field and magnetic field quality are comparatively strict. The present state of the design of the pulsed injection septum for the CR is presented in this article together with the concept of the injection system.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-TUPMB017  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPOR018 Comissioning of Upgraded VEPP-2000 Injection Chain 3811
 
  • D.E. Berkaev, A.V. Andrianov, K.V. Astrelina, V.V. Balakin, A.M. Barnyakov, O.V. Belikov, M.F. Blinov, D.V. Bochek, D. Bolkhovityanov, F.A. Emanov, A.R. Frolov, K. Gorchakov, Ye.A. Gusev, A.S. Kasaev, E. Kenzhbulatov, I. Koop, I.E. Korenev, G.Y. Kurkin, N.N. Lebedev, A.E. Levichev, P.V. Logatchov, A.P. Lysenko, D.A. Nikiforov, V.P. Prosvetov, Yu. A. Rogovsky, S.L. Samoylov, A.I. Senchenko, P.Yu. Shatunov, Y.M. Shatunov, D.B. Shwartz, A.A. Starostenko, I.M. Zemlyansky, Yu.M. Zharinov
    BINP SB RAS, Novosibirsk, Russia
  • F.A. Emanov, Yu. A. Rogovsky, A.I. Senchenko, A.A. Starostenko
    NSU, Novosibirsk, Russia
 
  The upgrade of VEPP-2000 e+e collider injection chain includes the connection to BINP Injection Complex (IC) via newly constructed transfer line K-500 as well as upgrade of the booster synchrotron BEP to the energy of 1 GeV. Modernization has started in the middle of 2013 and now the electron and positron beams with highly increased production rate together with top-up injection from BEP are ready to feed VEPP-2000 ring and provide design luminosity at the whole energy range limited only by beam-beam effects. The design and operation experience of IC damping ring, 250 m transfer channel and booster BEP dealing with 2.6 T magnets at top energy will be presented.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-THPOR018  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)