Author: Baussan, E.
Paper Title Page
THPMB001 Muon Production via the ESSnuSB Project 3213
 
  • E. Bouquerel, E. Baussan, M. Dracos
    IPHC, Strasbourg Cedex 2, France
  • N. Vassilopoulos
    IHEP, Beijing, People's Republic of China
 
  Funding: This project is now supported by the COST Action CA15139 "Combining forces for a novel European facility for neutrino-antineutrino symmetry-violation discovery" (EuroNuNet).
ESSnuSB plans to produce very intense neutrino beams using the protons from the ESS linac (5 MW, 2 GeV) and a 4-targets horn system. In the ESSnuSB proposed facility a copious number of muons will also be produced. These muons could be used by a future Neutrino Factory to study CP violation in the leptonic sector but also to study neutrino cross-sections. They could also be used to feed a future muon collider. The feasibility and the issues of extracting the intense muon beam produced together with neutrinos are discussed.
 
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-THPMB001  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)