Author: Aull, S.
Paper Title Page
THPOR024 Electrical Power Budget for FCC-ee 3828
 
  • F. Zimmermann, S. Aull, M. Benedikt, D. Bozzini, O. Brunner, J.-P. Burnet, A.C. Butterworth, R. Calaga, E. Jensen, V. Mertens, A. Milanese, M. Nonis, N. Schwerg, L.J. Tavian, J. Wenninger
    CERN, Geneva, Switzerland
  • A.P. Blondel, M. Koratzinos
    DPNC, Genève, Switzerland
  • Sh. Gorgi Zadeh
    Rostock University, Faculty of Computer Science and Electrical Engineering, Rostock, Germany
  • K. Oide
    KEK, Ibaraki, Japan
  • L. Rinolfi
    JUAS, Archamps, France
 
  Funding: Supported by the European Commission under the Capacities 7th Framework Programme project EuCARD-2, grant agreement 312453.
We present a first rough estimate for the electrical power consumption of the FCC-ee lepton collider. This electrical power is dominated by the RF system, which provides the motivation for the ongoing R&D on highly efficient RF power sources. Other contributions come from the warm arc magnets, the cryogenics systems, cooling, ventilation, general services, the particle-physics detectors, and the injector complex.
 
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-THPOR024  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)