Author: Atkinson, T.
Paper Title Page
WEPOW007 Status and Prospects of the BESSY II Injector System 2826
 
  • T. Atkinson, W. Anders, P. Goslawski, A. Jankowiak, F. Kramer, P. Kuske, D. Malyutin, A.N. Matveenko, A. Neumann, M. Ries, M. Ruprecht, A. Schälicke, T. Schneegans, D. Schüler, P.I. Volz, G. Wüstefeld
    HZB, Berlin, Germany
  • H.G. Glass
    BESSY GmbH, Berlin, Germany
 
  The BESSY II injector system consists of a 50 MeV Linac, installed in preparation for TopUp operation, and a 10 Hz fast-ramping booster synchrotron. The system provides injection efficiencies into the BESSY II storage ring well above 90 % . This contribution reports on the present status, measurements of energy acceptance and other essential beam parameters as well as studies on coupled-bunch-by-bunch instability. Requirements for BESSY-VSR and possible upgrade scenarios are discussed.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-WEPOW007  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPOW009 The Bessy Vsr Project for Short X-Ray Pulse Production 2833
 
  • A. Jankowiak, W. Anders, T. Atkinson, H. Ehmler, A. Föhlisch, P. Goslawski, K. Holldack, J. Knobloch, P. Kuske, D. Malyutin, A.N. Matveenko, R. Müller, A. Neumann, K. Ott, M. Ries, M. Ruprecht, A. Schälicke, A.V. Vélez, G. Wüstefeld
    HZB, Berlin, Germany
  • A. Burrill
    SLAC, Menlo Park, California, USA
 
  Funding: Work supported by the German Bundesministerium für Bildung und Forschung, Land Berlin and grants of the Helmholtz Association
HZB has started the innovative project, BESSY VSR, to upgrade the 1.7 GeV synchrotron radiation source BESSY II. Its goal is to provide both 1.7 ps and 15 ps long, intense X-ray pulses simultaneously at all beam lines. These pulses are generated by enhanced longitudinal bunch focusing using superconducting 5-cell cavities operating at 1.5 GHz and 1.75 GHz. The resulting beating of the voltages creates alternating long and short buckets that can be custom filled. As a first major step, prototype superconducting cavities, initially only cooled to 4.4 K and thus operating at reduced voltage, will be installed into the BESSY II storage ring. Physical and technical aspects of this proposal where recently studied* and the results and project status are presented.
* A. Jankowiak, J. Knobloch for the BESSY VSR team, Technical Design Study BESSY VSR, doi:10.5442/R0001, Helmholtz-Zentrum Berlin (Germany), June 2015.
 
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-WEPOW009  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)