JACoW logo

Joint Accelerator Conferences Website

The Joint Accelerator Conferences Website (JACoW) is an international collaboration that publishes the proceedings of accelerator conferences held around the world.


RIS citation export for TUPMR049: Feasibility Study of the PS Injection for 2 GeV LIU Beams with an Upgraded KFA-45 Injection Kicker System Operating in Short Circuit Mode

TY - CONF
AU - Kramer, T.
AU - Bartmann, W.
AU - Borburgh, J.C.C.M.
AU - Ducimetière, L.
AU - Feliciano, L.M.C.
AU - Ferrero Colomo, A.
AU - Goddard, B.
AU - Sermeus, L.
ED - Petit-Jean-Genaz, Christine
ED - Kim, Dong Eon
ED - Kim, Kyung Sook
ED - Ko, In Soo
ED - Schaa, Volker RW
TI - Feasibility Study of the PS Injection for 2 GeV LIU Beams with an Upgraded KFA-45 Injection Kicker System Operating in Short Circuit Mode
J2 - Proc. of IPAC2016, Busan, Korea, May 8-13, 2016
C1 - Busan, Korea
T2 - International Particle Accelerator Conference
T3 - 7
LA - english
AB - Under the scope of the LIU project the CERN PS Booster to PS beam transfer will be modified to match the requirements for the future 2 GeV beams. This paper describes the evaluation of the proposed upgrade of the PS injection kicker. Different schemes of an injection for LIU beams into the PS have been outlined in the past already under the aspect of individual transfer kicker rise and fall time performances. Homogeneous rise and fall time requirements in the whole PSB to PS transfer chain have been established which allowed to consider an upgrade option of the present injection kicker system operated in short circuit mode. The challenging pulse quality constraints require an improvement of the flat top and post pulse ripples. Both operation modes, terminated and short circuit mode are analysed and analogue circuit simulations for the present and upgraded system are outlined. Recent measurements on the installed kickers are presented and analysed together with the simulation data. First measurements verifying the performance of upgrade options have been taken during the last end of the year stop. The paper concludes with an upgrade plan and a brief overview of implementation risks.
PB - JACoW
CP - Geneva, Switzerland
SP - 1363
EP - 1366
KW - simulation
KW - injection
KW - kicker
KW - flattop
KW - operation
DA - 2016/06
PY - 2016
SN - 978-3-95450-147-2
DO - 10.18429/JACoW-IPAC2016-TUPMR049
UR - http://jacow.org/ipac2016/papers/tupmr049.pdf
ER -