JACoW logo

Joint Accelerator Conferences Website

The Joint Accelerator Conferences Website (JACoW) is an international collaboration that publishes the proceedings of accelerator conferences held around the world.


RIS citation export for TUPMR025: Design of the LBNF Beamline

TY - CONF
AU - Papadimitriou, V.
AU - Ammigan, K.
AU - Anderson, J.E.
AU - Anderson, K.
AU - Andrews, R.
AU - Bocean, V.T.
AU - Crowley, C.F.
AU - Densham, C.J.
AU - Eddy, N.
AU - Hartsell, B.D.
AU - Hays, S.
AU - Hurh, P.
AU - Hylen, J.
AU - Johnstone, J.A.
AU - Kasper, P.H.
AU - Kobilarcik, T.R.
AU - Krafczyk, G.E.
AU - Lundberg, B.G.
AU - Marchionni, A.
AU - Mokhov, N.V.
AU - Moore, C.D.
AU - Pushka, D.
AU - Rakhno, I.L.
AU - Reitzner, S.D.
AU - Schlabach, P.
AU - Sidorov, V.I.
AU - Stefanik, A.M.
AU - Tariq, S.
AU - Valerio, L.R.
AU - Vaziri, K.
AU - Velev, G.
AU - Vogel, G.L.
AU - Williams, K.E.
AU - Zwaska, R.M.
ED - Petit-Jean-Genaz, Christine
ED - Kim, Dong Eon
ED - Kim, Kyung Sook
ED - Ko, In Soo
ED - Schaa, Volker RW
TI - Design of the LBNF Beamline
J2 - Proc. of IPAC2016, Busan, Korea, May 8-13, 2016
C1 - Busan, Korea
T2 - International Particle Accelerator Conference
T3 - 7
LA - english
AB - The Long Baseline Neutrino Facility (LBNF) will utilize a beamline located at Fermilab to provide and aim a neutrino beam of sufficient intensity and appropriate energy range toward DUNE detectors, placed deep underground at the SURF Facility in South Dakota. The primary proton beam (60 - 120 GeV) will be extracted from the MI-10 section of Fermilab's Main Injector. Neutrinos are produced after the protons hit a solid target and produce mesons which are subsequently focused by magnetic horns into a 194 m long decay pipe where they decay into muons and neutrinos. The parameters of the facility were determined taking into account the physics goals, spacial and radiological constraints and the experience gained by operating the NuMI facility at Fermilab. The Beamline facility is designed for initial operation at a proton-beam power of 1.2 MW, with the capability to support an upgrade to 2.4 MW. LBNF/DUNE obtained CD-1 approval in November 2015. We discuss here the design status and the associated challenges as well as the R&D and plans for improvements before baselining the facility.
PB - JACoW
CP - Geneva, Switzerland
SP - 1291
EP - 1293
KW - target
KW - proton
KW - shielding
KW - operation
KW - extraction
DA - 2016/06
PY - 2016
SN - 978-3-95450-147-2
DO - 10.18429/JACoW-IPAC2016-TUPMR025
UR - http://jacow.org/ipac2016/papers/tupmr025.pdf
ER -