Paper | Title | Page |
---|---|---|
TUOCB101 | Argonne Wakefield Accelerator (AWA): A Facility for the Development of High Gradient Accelerating Structures and Wakefield Measurements | 1111 |
|
||
Funding: Work supported by the U.S. Department of Energy under contract No. DE-AC02-06CH11357. The recently upgraded AWA facility is being commissioned. Operation of the new L-Band RF gun with a Cesium Telluride photocathode will generate long electron bunch trains, with high charge per bunch (up to 100 nC). The six new linac tanks will boost the beam energy to 75 MeV, making it an extremely well suited drive beam to excite wakefields in structures. One of the main goals of the facility is to generate RF pulses with GW power levels, corresponding to accelerating gradients of hundreds of MV/m and energy gains on the order of 100 MeV per structure. A key aspect of the studies and experiments carried out at the AWA facility is the use of relatively short RF pulses (15 – 25 ns), which is believed to mitigate the risk of breakdown and structure damage. |
||
![]() |
Slides TUOCB101 [3.416 MB] | |
TUPEA087 | Experiment on Multipactor Suppression in Dielectric-loaded Accelerating Structures with a Solenoid Field | 1319 |
|
||
Funding: US DoE SBIR Phase I project under contract #DE-SC0007629 Efforts by numerous institutions have been ongoing over the past decade to develop a Dielectric-Loaded Accelerating (DLA) structure capable of supporting high gradient acceleration when driven by an external rf source. Multipactor is the major issue limiting the gradient that was revealed in earlier experiments. A theoretical model predicts that the strength of solenoid field within an optimal range applied to DLA structures may completely block the multipactor. To demonstrate this approach, two DLA test structures have been built and the first high power test will be conducted in December 2012. The results will be reported. |
||