Author: Witte, H.
Paper Title Page
MOPZ007 A Non-scaling Fixed Field Alternating Gradient Accelerator for the Final Acceleration Stage of the International Design Study of the Neutrino Factory 832
 
  • J.S. Berg
    BNL, Upton, Long Island, New York, USA
  • M. Aslaninejad, J. Pasternak
    Imperial College of Science and Technology, Department of Physics, London, United Kingdom
  • N. Bliss, M.A. Cordwell, T.J. Jones
    STFC/DL, Daresbury, Warrington, Cheshire, United Kingdom
  • D.J. Kelliher, S. Machida
    STFC/RAL/ASTeC, Chilton, Didcot, Oxon, United Kingdom
  • A.A. Muir
    STFC/DL/ASTeC, Daresbury, Warrington, Cheshire, United Kingdom
  • H. Witte
    JAI, Oxford, United Kingdom
 
  Funding: This manuscript has been authored by employees of Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy.
The International Design Study of the Neutrino Factory (IDS-NF) has recently completed its Interim Design Report (IDR), which presents our current baseline design of the neutrino factory. To increase the efficiency and reduce the cost of acceleration, the IDR design uses a linear non-scaling fixed field alternating gradient accelerator (FFAG) for its final acceleration stage. We present the current lattice design of that FFAG, including the main ring plus its injection and extraction systems. We describe parameters for the main ring magnets, kickers, and septa, as well as the power supplies for the kickers. We present a first pass at an engineering layout for the ring and its subsystems.
 
 
MOPZ004 Studies for the PRISM FFAG Ring for the Next Generation Muon to Electron Conversion Experiment 826
 
  • J. Pasternak
    STFC/RAL, Chilton, Didcot, Oxon, United Kingdom
  • M. Aslaninejad, L.J. Jenner, A. Kurup, J. Pasternak, Y. Shi, Y. Uchida
    Imperial College of Science and Technology, Department of Physics, London, United Kingdom
  • R.J. Barlow
    UMAN, Manchester, United Kingdom
  • K.M. Hock, B.D. Muratori
    Cockcroft Institute, Warrington, Cheshire, United Kingdom
  • D.J. Kelliher, S. Machida, C.R. Prior
    STFC/RAL/ASTeC, Chilton, Didcot, Oxon, United Kingdom
  • Y. Kuno, A. Sato
    Osaka University, Osaka, Japan
  • J.-B. Lagrange, Y. Mori
    KURRI, Osaka, Japan
  • M. Lancaster
    UCL, London, United Kingdom
  • C. Ohmori
    KEK, Tokai, Ibaraki, Japan
  • T. Planche
    TRIUMF, Canada's National Laboratory for Particle and Nuclear Physics, Vancouver, Canada
  • S.L. Smith
    STFC/DL/ASTeC, Daresbury, Warrington, Cheshire, United Kingdom
  • H. Witte, T. Yokoi
    JAI, Oxford, United Kingdom
 
  High intensity and high quality muon beams are needed for the next generation lepton flavour violation experiments. Such beams can be produced by sending a short proton pulse to a pion production target, capturing the pions and performing RF phase rotation on the resulting muon beam in an FFAG ring. Such a solution was proposed for the PRISM project and this paper summarizes its current status. In particular the PRISM task force was created to address the accelerator and detector issues that need to be solved in order to realise the PRISM experiment. Alternative designs for the PRISM FFAG ring are discussed and their performance compared. The injection/extraction systems and matching to the solenoid channels upstream and downstream of the FFAG ring are presented. The future direction for the study will be outlined.