Author: White, G.R.
Paper Title Page
TUPC016 Status of the ATF2 Lattices 1027
 
  • E. Marin, R. Tomás
    CERN, Geneva, Switzerland
  • P. Bambade
    LAL, Orsay, France
  • T. Okugi, T. Tauchi, N. Terunuma, J. Urakawa
    KEK, Ibaraki, Japan
  • A. Seryi
    JAI, Oxford, United Kingdom
  • G.R. White, M. Woodley
    SLAC, Menlo Park, California, USA
 
  The latest status for the ATF2 Nominal and Ultra-low beta lattices designs obtained to minimize the detrimental effect of the measured multipoles are presented in this paper. A set of correction knobs for the most important aberrations at the IP have been obtained for both lattices in order to perform the tuning under realistic imperfections. Starting from the tuned ATF2 Nominal lattice a squeeze sequence reducing betay is performed to reach the ultra-low beta lattice. Tuning results are shown for both options.  
 
TUPC127 Optical Transition Radiation System for ATF2 1317
 
  • J. Alabau-Gonzalvo, C. Blanch Gutierrez, A. Faus-Golfe, J.J. García-Garrigós
    IFIC, Valencia, Spain
  • J. Cruz, D.J. McCormick, G.R. White, M. Woodley
    SLAC, Menlo Park, California, USA
 
  Funding: Funding Agency: FPA2010-21456-C02-01 Work supported in part by Department of Energy Contract DE-AC02-76SF00515
In this paper we present the first measurements performed during the fall 2010 and early 2011 runs. Software development, simulations and hardware improvements to the Multi-Optical Transition Radiation System installed in the beam diagnostic section of the Extraction (EXT) line of ATF2 are described. 2D emittance measurements have been performed and the system is being routinely used for coupling correction. Realistic beam simulations have been made and compared with the measurements. A 4D emittance procedure, yet to be implemented, is also discussed. A demagnifier lens system to improve the beam finding procedure has been designed and will be implemented in a future run. Finally, we discuss further verification work planned for the next run period of ATF.
 
 
TUPC119 A Comprehensive Study of Nanometer Resolution of the IPBPM at ATF2* 1296
 
  • Y.I. Kim, H. Park
    Kyungpook National University, Daegu, Republic of Korea
  • S.T. Boogert
    Royal Holloway, University of London, Surrey, United Kingdom
  • J.C. Frisch, D.J. McCormick, J. Nelson, T.J. Smith, G.R. White, M. Woodley
    SLAC, Menlo Park, California, USA
  • Y. Honda, R. Sugahara, T. Tauchi, N. Terunuma, J. Urakawa
    KEK, Ibaraki, Japan
 
  Funding: Work supported in part by Department of Energy Contract DE-AC02-76SF00515.
High-resolution beam position monitors (IPBPMs) have been developed in order to measure the electron beam position at the focus point of ATF2 to a few nanometers in the vertical plane. To date, the IPBPM system has operated in test mode with a highest demonstrated resolution of 8.7 nm in the ATF extraction line during 2008. After expected noise source calculations there still remains 7.9 nm of noise of unexplained origin. We summarize the experimental work on the IPBPM system since this measurement and outline the possible origins of these sources. We then present a study plan to be performed at the ATF2 facility designed to identify and to improve the resolution performance and comment on the expected ultimate resolution of this system.
 
 
TUPC161 Cavity Beam Position Monitor System for ATF2 1410
 
  • S.T. Boogert, R. Ainsworth, G.E. Boorman, S. Molloy
    Royal Holloway, University of London, Surrey, United Kingdom
  • A.S. Aryshev, Y. Honda, N. Terunuma, J. Urakawa
    KEK, Ibaraki, Japan
  • F.J. Cullinan, N.Y. Joshi, A. Lyapin
    JAI, Egham, Surrey, United Kingdom
  • J.C. Frisch, D.J. McCormick, J. Nelson, T.J. Smith, G.R. White
    SLAC, Menlo Park, California, USA
  • A. Heo, E.-S. Kim, Y.I. Kim
    KNU, Deagu, Republic of Korea
 
  The Accelerator Test Facility 2 (ATF2) in KEK, Japan, is a prototype scaled demonstrator system for the final focus required for a future high energy lepton linear collider. The ATF2 beam-line is instrumented with a total of 41 high resolution C and S band resonant cavity beam position monitors (BPM) with associated mixer electronics and digitizers. In addition 4 high resolution BPMs have been recently installed at the interaction point, we briefly describe the first operational experience of these cavities in the ATF2 beam-line. The current status of the overall BPM system is also described, with a focus on operational techniques and performance.