Author: Tsuchiya, K.
Paper Title Page
MOODA02 S1-Global Module Tests at STF/KEK 38
 
  • D. Kostin, K. Jensch, L. Lilje, A. Matheisen, W.-D. Möller, P. Schilling, M. Schmökel, N.J. Walker, H. Weise
    DESY, Hamburg, Germany
  • C. Adolphsen, C.D. Nantista
    SLAC, Menlo Park, California, USA
  • M. Akemoto, S. Fukuda, K. Hara, H. Hayano, N. Higashi, E. Kako, H. Katagiri, Y. Kojima, Y. Kondo, T. Matsumoto, H. Matsushita, S. Michizono, T. Miura, H. Nakai, H. Nakajima, K. Nakanishi, S. Noguchi, N. Ohuchi, T. Saeki, M. Satoh, T. Shidara, T. Shishido, T. Takenaka, A. Terashima, N. Toge, K. Tsuchiya, K. Watanabe, S. Yamaguchi, A. Yamamoto, Y. Yamamoto, K. Yokoya
    KEK, Ibaraki, Japan
  • T.T. Arkan, S. Barbanotti, M.A. Battistoni, H. Carter, M.S. Champion, A. Hocker, R.D. Kephart, J.S. Kerby, D.V. Mitchell, T.J. Peterson, Y.M. Pischalnikov, M.C. Ross, W. Schappert, B.E. Smith
    Fermilab, Batavia, USA
  • A. Bosotti, C. Pagani, R. Paparella, P. Pierini
    INFN/LASA, Segrate (MI), Italy
 
  S1-Global collaborative effort of INFN, DESY, FNAL, SLAC and KEK, recently successfully finished at KEK as a part of ILC GDE, is an important milestone for the ILC. International collaboration of three regions, Asia, North America and Europe, proved to be efficient on the construction and cold tests of the accelerating module consisting of 8 SRF cavities; 2 from FNAL, 2 from DESY and 4 from KEK. Three different cavity tuning systems were tested together with two types of high power couplers. The module was cooled down three times which enabled extensive high power tests with cavities, performance limits investigation, Lorentz force detuning tests, simultaneous multiple cavities operation and other activities such as an operation test of distributed RF scheme with low level RF feedback. The results of this S1-Global module test are presented and discussed.  
slides icon Slides MOODA02 [2.982 MB]  
 
WEPO027 Design Study of Final Focusing Superconducting Magnets for the SuperKEKB 2457
 
  • M. Tawada, N. Higashi, M. Iwasaki, H. Koiso, A. Morita, Y. Ohnishi, N. Ohuchi, K. Oide, T. Oki, K. Tsuchiya, H. Yamaoka, Z.G. Zong
    KEK, Ibaraki, Japan
 
  For SuperKEKB, which is an upgrade project of KEKB, we are studying the design of the final focus quadrupole magnets for the interaction region. The 7 GeV electrons in the high-energy ring and the 4 GeV positrons in the low-energy ring collide at one IP with a finite crossing angle of 83 mrad. For each beam, the final beam focusing system consists of the superconducting quadrupole-doublets. These quadrupole magnets have to meet specifications described below. (1) Because of the small beam separation between two beam lines, the superconducting magnet is designed with thin coils and the conductor size is required to be minimized. (2) Since the beta functions are so large, a large space with a good field quality is required. (3) These magnets must apply the focusing fields on electrons and positrons, independent each other. The quadrupole magnets in the solenoid field of the particle detector are designed without an iron yoke. Consequently, the reduction of the leakage fields from the adjacent beam lines is a critical issue to achieve large dynamic aperture. In this paper we will report the design of final focusing system.  
 
WEPO035 Thermal Performance of the S1-Global Cryomodule for ILC 2472
 
  • N. Ohuchi, M. Akemoto, S. Fukuda, K. Hara, H. Hayano, N. Higashi, E. Kako, Y. Kojima, Y. Kondo, T. Matsumoto, S. Michizono, T. Miura, H. Nakai, H. Nakajima, K. Nakanishi, S. Noguchi, T. Saeki, M. Satoh, T. Shidara, T. Shishido, T. Takenaka, A. Terashima, N. Toge, K. Tsuchiya, K. Watanabe, S. Yamaguchi, A. Yamamoto, Y. Yamamoto, K. Yokoya
    KEK, Ibaraki, Japan
  • T.T. Arkan, S. Barbanotti, H. Carter, M.S. Champion, A. Hocker, R.D. Kephart, J.S. Kerby, D.V. Mitchell, T.J. Peterson, Y.M. Pischalnikov, M.C. Ross
    Fermilab, Batavia, USA
  • A. Bosotti, C. Pagani, R. Paparella, P. Pierini
    INFN/LASA, Segrate (MI), Italy
  • D. Kostin, L. Lilje, A. Matheisen, W.-D. Möller, N.J. Walker, H. Weise
    DESY, Hamburg, Germany
 
  The S1-Global program is the international research collaboration among INFN, FNAL, DESY, SLAC and KEK as one of the GDE R&D for construction of ILC. The S1-Global cryomodule consists of two half-size cryomodules of 6 meter. One was designed by IFNF, and it contained two FNAL cavities and two DESY cavities. The associated components, like input couplers and RF cables, were same as the TTF-III cryomodule. The other was designed by KEK, and the thermal design was based on the TTF-III cryomodule. This cryomodule contains four KEK cavities with the associated components which were designed by KEK. For characterizing the thermal performances of two cryomodules, the static heat load and the temperature profiles of the cold components were measured. The temperature profiles of the components were compared between two cryomodules and the static heat load was evaluated with the design values of the cryomodules. The dynamic losses of the DESY, FNAL and two KEK cavities at their maximum operative gradients were measured and, with the measured losses, Q values were calculated. In this paper, we will make the summary of the thermal measurements of the S1-Global cryomodule.  
 
THPC034 Post-earthquake Recovery of PF Ring and PF-AR 2984
 
  • T. Honda, T. Aoto, S. Asaoka, K. Endo, K. Haga, K. Harada, Y. Honda, M. Izawa, Y. Kobayashi, A. Mishina, T. Miyajima, H. Miyauchi, S. Nagahashi, N. Nakamura, T. Nogami, T. Obina, T. Ozaki, C.O. Pak, H. Sakai, S. Sakanaka, H. Sasaki, Y. Sato, K. Satoh, M. Shimada, T. Shioya, M. Tadano, T. Tahara, T. Takahashi, R. Takai, Y. Tanimoto, K. Tsuchiya, T. Uchiyama, A. Ueda, K. Umemori, M. Yamamoto
    KEK, Ibaraki, Japan
 
  When the unprecedented scale of earthquake occurred in Japan on the afternoon of March 11, 2011, PF ring and PF-AR, two synchrotron light sources in KEK, also suffered various damages. At PF ring, a formed bellows in a wall current monitor was broken, and atmospheric air rushed into the beam duct. At PF-AR, which is installed in the underground tunnel, the alignment of the ring magnets seemed to be disordered to an order of ten mm. At both rings, a lot of electronics racks and toolboxes in the control rooms or in the experimental halls were tilted or tipped over. It was extremely fortunate that the user operation had just been stopped on the morning of that day, and all the gate valves in the rings and to the beam lines had already been closed for the scheduled shutdown. A wide area blackout took place at the big earthquake, and the electric power for the accelerator was interrupted over the next two weeks because of temporal shortage of the electricity in the eastern part of Japan. In April, we could start detailed investigation of machine damages and repair works towards recommissioning of the rings before the summer and resumption of the user operations in the autumn.