Author: Tahara, T.
Paper Title Page
THPC034 Post-earthquake Recovery of PF Ring and PF-AR 2984
 
  • T. Honda, T. Aoto, S. Asaoka, K. Endo, K. Haga, K. Harada, Y. Honda, M. Izawa, Y. Kobayashi, A. Mishina, T. Miyajima, H. Miyauchi, S. Nagahashi, N. Nakamura, T. Nogami, T. Obina, T. Ozaki, C.O. Pak, H. Sakai, S. Sakanaka, H. Sasaki, Y. Sato, K. Satoh, M. Shimada, T. Shioya, M. Tadano, T. Tahara, T. Takahashi, R. Takai, Y. Tanimoto, K. Tsuchiya, T. Uchiyama, A. Ueda, K. Umemori, M. Yamamoto
    KEK, Ibaraki, Japan
 
  When the unprecedented scale of earthquake occurred in Japan on the afternoon of March 11, 2011, PF ring and PF-AR, two synchrotron light sources in KEK, also suffered various damages. At PF ring, a formed bellows in a wall current monitor was broken, and atmospheric air rushed into the beam duct. At PF-AR, which is installed in the underground tunnel, the alignment of the ring magnets seemed to be disordered to an order of ten mm. At both rings, a lot of electronics racks and toolboxes in the control rooms or in the experimental halls were tilted or tipped over. It was extremely fortunate that the user operation had just been stopped on the morning of that day, and all the gate valves in the rings and to the beam lines had already been closed for the scheduled shutdown. A wide area blackout took place at the big earthquake, and the electric power for the accelerator was interrupted over the next two weeks because of temporal shortage of the electricity in the eastern part of Japan. In April, we could start detailed investigation of machine damages and repair works towards recommissioning of the rings before the summer and resumption of the user operations in the autumn.