Author: Semin, N.V.
Paper Title Page
WEPS013 Results of the Nuclotron Upgrade Program 2508
 
  • A.V. Eliseev, N.N. Agapov, A.V. Alfeev, V. Andreev, V. Batin, D.E. Donets, E.D. Donets, E.E. Donets, E.V. Gorbachev, A. Govorov, V. Karpinsky, V.D. Kekelidze, H.G. Khodzhibagiyan, A. Kirichenko, A.D. Kovalenko, O.S. Kozlov, N.I. Lebedev, I.N. Meshkov, V.A. Mikhailov, V. Monchinsky, S. Romanov, T.V. Rukoyatkina, A.O. Sidorin, I. Slepnev, V. Slepnev, A.V. Smirnov, A. Sorin, G.V. Trubnikov, B. Vasilishin
    JINR, Dubna, Moscow Region, Russia
  • O.I. Brovko, A.V. Butenko, N.V. Semin, V. Volkov
    JINR/VBLHEP, Moscow, Russia
 
  The Nuclotron upgrade – the Nuclotron-M project, which had been started in 2007, involved the modernization of almost all of the accelerator systems, using beam time during seven runs devoted to testing newly installed equipment. Following the project goals, in March 2010 Xe ions were accelerated to about 1.5 GeV/u. In December 2010, the stable and safe operation of the magnetic system was achieved with a main field of 2 T. The successful completion of the project paves the way for further development of the Nuclotron-based Ion Collider fAcility (NICA).