MOPC123 Temperature Dependent Microphonics in the BNL Electron Cooler* 370
 
  • P. Jain
    Stony Brook University, Stony Brook, USA
  • I. Ben-Zvi, C. Schultheiss
    BNL, Upton, Long Island, New York, USA
 
  An R&D Energy Recovery Linac (ERL), to be used in the BNL electron cooler, has been operational in a developmental setting. The ERL requires a cryogenic system to supply cooling to a superconducting RF gun and the 5-cell superconducting RF cavity system that is kept cold at 2K. The 2K superfluid bath is produced by pumping on the bath using a sub-atmospheric warm compression system. During a test run in October 2010, a resonance peak corresponding to a noise of 30 Hz was observed at 1.88K. This noise peak, present at all temperatures below 2K, is assumed to be of mechanical origin from the vibration of the cryopump. Another resonance noise peak of 16 Hz, characteristic of the system, was observed at 1.98K, which shifted towards the 30 Hz peak as the temperature of the cryostat varied from 1.98K to 1.88K. The 16 Hz resonance peak upon hitting the 30 Hz resonance peak, sets a resonance condition, thereby the 30 Hz peak getting amplified by more than five times. In this paper we explore the origin of the temperature dependent 16 Hz resonance peak and give a physical explanation of the resonance.  
 
TUPZ038 RHIC Performance for FY2011 Au+Au Heavy Ion Run 1894
 
  • G.J. Marr, L. A. Ahrens, M. Bai, J. Beebe-Wang, I. Blackler, M. Blaskiewicz, J.M. Brennan, K.A. Brown, D. Bruno, J.J. Butler, C. Carlson, R. Connolly, T. D'Ottavio, K.A. Drees, A.V. Fedotov, W. Fischer, W. Fu, C.J. Gardner, D.M. Gassner, J.W. Glenn, X. Gu, M. Harvey, T. Hayes, L.T. Hoff, H. Huang, P.F. Ingrassia, J.P. Jamilkowski, N.A. Kling, M. Lafky, J.S. Laster, C. Liu, Y. Luo, M. Mapes, A. Marusic, K. Mernick, R.J. Michnoff, M.G. Minty, C. Montag, J. Morris, C. Naylor, S. Nemesure, S. Polizzo, V. Ptitsyn, G. Robert-Demolaize, T. Roser, P. Sampson, J. Sandberg, V. Schoefer, C. Schultheiss, F. Severino, T.C. Shrey, K.S. Smith, D. Steski, S. Tepikian, P. Thieberger, D. Trbojevic, N. Tsoupas, J.E. Tuozzolo, B. Van Kuik, G. Wang, M. Wilinski, A. Zaltsman, K. Zeno, S.Y. Zhang
    BNL, Upton, Long Island, New York, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy.
Following the Fiscal Year (FY) 2010 (Run-10) Relativistic Heavy Ion Collider (RHIC) Au+Au run [1], RHIC experiment upgrades sought to improve detector capabilities. In turn, accelerator improvements were made to improve the luminosity available to the experiments for this run (Run-11). These improvements included: a redesign of the stochastic cooling systems for improved reliability; a relocation of “common” RF cavities to alleviate intensity limits due to beam loading; and an improved usage of feedback systems to control orbit, tune and coupling during energy ramps as well as while colliding at top energy. We present an overview of changes to the Collider and review the performance of the collider with respect to instantaneous and integrated luminosity goals.