Author: Ross, M.C.
Paper Title Page
MOYBA01 Present Status of the ILC Project and Developments 16
 
  • M.C. Ross
    Fermilab, Batavia, USA
  • N.J. Walker
    DESY, Hamburg, Germany
  • A. Yamamoto
    KEK, Ibaraki, Japan
 
  Funding: FNAL is operated by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the United States Department of Energy.
The Technical Design of the ILC Project will be finished in late 2012. The Technical Design Report will include a description of the updated design, with a cost estimate and a project plan, and the results of R & D done in support of the ILC. Results from directed ILC R & D are used to reduce the cost and risk associated with the ILC design. We present a summary of key challenges and show how the global R & D effort has addressed them. The most important activity has been in pursuit of very high gradient superconducting RF linac technology. There has been excellent progress toward the goal of practical industrial production of niobium sheet-metal cavities with gradient performance in excess of 35 MV/m. In addition, three purpose-built beam test facilities have been constructed and used to study and demonstrate high current linac performance, electron-cloud beam dynamics and precision beam control. The report also includes a summary of component design studies and conventional facilities cost optimization design studies.
 
slides icon Slides MOYBA01 [9.755 MB]  
 
MOODA02 S1-Global Module Tests at STF/KEK 38
 
  • D. Kostin, K. Jensch, L. Lilje, A. Matheisen, W.-D. Möller, P. Schilling, M. Schmökel, N.J. Walker, H. Weise
    DESY, Hamburg, Germany
  • C. Adolphsen, C.D. Nantista
    SLAC, Menlo Park, California, USA
  • M. Akemoto, S. Fukuda, K. Hara, H. Hayano, N. Higashi, E. Kako, H. Katagiri, Y. Kojima, Y. Kondo, T. Matsumoto, H. Matsushita, S. Michizono, T. Miura, H. Nakai, H. Nakajima, K. Nakanishi, S. Noguchi, N. Ohuchi, T. Saeki, M. Satoh, T. Shidara, T. Shishido, T. Takenaka, A. Terashima, N. Toge, K. Tsuchiya, K. Watanabe, S. Yamaguchi, A. Yamamoto, Y. Yamamoto, K. Yokoya
    KEK, Ibaraki, Japan
  • T.T. Arkan, S. Barbanotti, M.A. Battistoni, H. Carter, M.S. Champion, A. Hocker, R.D. Kephart, J.S. Kerby, D.V. Mitchell, T.J. Peterson, Y.M. Pischalnikov, M.C. Ross, W. Schappert, B.E. Smith
    Fermilab, Batavia, USA
  • A. Bosotti, C. Pagani, R. Paparella, P. Pierini
    INFN/LASA, Segrate (MI), Italy
 
  S1-Global collaborative effort of INFN, DESY, FNAL, SLAC and KEK, recently successfully finished at KEK as a part of ILC GDE, is an important milestone for the ILC. International collaboration of three regions, Asia, North America and Europe, proved to be efficient on the construction and cold tests of the accelerating module consisting of 8 SRF cavities; 2 from FNAL, 2 from DESY and 4 from KEK. Three different cavity tuning systems were tested together with two types of high power couplers. The module was cooled down three times which enabled extensive high power tests with cavities, performance limits investigation, Lorentz force detuning tests, simultaneous multiple cavities operation and other activities such as an operation test of distributed RF scheme with low level RF feedback. The results of this S1-Global module test are presented and discussed.  
slides icon Slides MOODA02 [2.982 MB]  
 
WEPO035 Thermal Performance of the S1-Global Cryomodule for ILC 2472
 
  • N. Ohuchi, M. Akemoto, S. Fukuda, K. Hara, H. Hayano, N. Higashi, E. Kako, Y. Kojima, Y. Kondo, T. Matsumoto, S. Michizono, T. Miura, H. Nakai, H. Nakajima, K. Nakanishi, S. Noguchi, T. Saeki, M. Satoh, T. Shidara, T. Shishido, T. Takenaka, A. Terashima, N. Toge, K. Tsuchiya, K. Watanabe, S. Yamaguchi, A. Yamamoto, Y. Yamamoto, K. Yokoya
    KEK, Ibaraki, Japan
  • T.T. Arkan, S. Barbanotti, H. Carter, M.S. Champion, A. Hocker, R.D. Kephart, J.S. Kerby, D.V. Mitchell, T.J. Peterson, Y.M. Pischalnikov, M.C. Ross
    Fermilab, Batavia, USA
  • A. Bosotti, C. Pagani, R. Paparella, P. Pierini
    INFN/LASA, Segrate (MI), Italy
  • D. Kostin, L. Lilje, A. Matheisen, W.-D. Möller, N.J. Walker, H. Weise
    DESY, Hamburg, Germany
 
  The S1-Global program is the international research collaboration among INFN, FNAL, DESY, SLAC and KEK as one of the GDE R&D for construction of ILC. The S1-Global cryomodule consists of two half-size cryomodules of 6 meter. One was designed by IFNF, and it contained two FNAL cavities and two DESY cavities. The associated components, like input couplers and RF cables, were same as the TTF-III cryomodule. The other was designed by KEK, and the thermal design was based on the TTF-III cryomodule. This cryomodule contains four KEK cavities with the associated components which were designed by KEK. For characterizing the thermal performances of two cryomodules, the static heat load and the temperature profiles of the cold components were measured. The temperature profiles of the components were compared between two cryomodules and the static heat load was evaluated with the design values of the cryomodules. The dynamic losses of the DESY, FNAL and two KEK cavities at their maximum operative gradients were measured and, with the measured losses, Q values were calculated. In this paper, we will make the summary of the thermal measurements of the S1-Global cryomodule.