Author: Rabiller, A.
Paper Title Page
TUPC048 First Measurement Results of the LHC Longitudinal Density Monitor 1105
 
  • A. Jeff, M. Andersen, A. Boccardi, S. Bozyigit, E. Bravin, T. Lefèvre, A. Rabiller, F. Roncarolo
    CERN, Geneva, Switzerland
  • A.S. Fisher
    SLAC, Menlo Park, California, USA
  • C.P. Welsch
    Cockcroft Institute, Warrington, Cheshire, United Kingdom
 
  Funding: The primary author is funded by the E.U. under the DITANET Marie Curie network.
Knowledge of the longitudinal distribution of particles is important for various aspects of accelerator operation, for example to check the injection quality and to characterize the development of ghost bunches before and during the physics periods. A new detector, the LHC Longitudinal Density Monitor (LDM) is a single-photon counting system measuring synchrotron light by means of an avalanche photodiode detector. The unprecedented energies reached in the LHC allow synchrotron light diagnostics to be used with both protons and heavy ions. The LDM is able to longitudinally profile the whole ring with a resolution close to the target of 50 ps. On-line correction for the effects of the detector deadtime, pile-up and afterpulsing allow a dynamic range of 105 to be achieved. The LDM operated during the 2010 lead ion run and during 2011 with protons. Measurements from both runs are presented in this contribution along with an analysis of the LDM performance and an outlook for future upgrades.
 
 
MOPC150 High Charge PHIN Photo Injector at CERN with Fast Phase Switching within the Bunch Train for Beam Combination 430
 
  • M. Divall Csatari, A. Andersson, B. Bolzon, E. Bravin, E. Chevallay, A.E. Dabrowski, S. Döbert, V. Fedosseev, C. Heßler, T. Lefèvre, S. Livesley, R. Losito, O. Mete, M. Olvegård, M. Petrarca, A. Rabiller
    CERN, Geneva, Switzerland
  • A. Drozdy
    BUTE, Budapest, Hungary
  • D. Egger
    EPFL, Lausanne, Switzerland
 
  The high charge PHIN photo-injector was developed within the frame of the European CARE program to provide an alternative to the drive beam thermionic gun in CTF3 (CLIC Test Facility) at CERN. In PHIN 1908 bunches are delivered with bunch spacing of 1.5 GHz and 2.33 nC charge per bunch. Furthermore the drive beam generated by CTF3 requires several fast 180 deg phase-shifts with respect to the 1.5 GHz bunch repetition frequency in order to allow the beam combination scheme developed at CTF3. A total of 8 sub-trains, each 140 ns long and shifted in phase with respect to each other, have to be produced with very high phase and amplitude stability. A novel fiber modulator based phase-switching technique developed on the laser system provides this phase-shift between two consecutive pulses much faster and cleaner than the base line scheme, where a thermionic electron gun and sub-harmonic bunching are used. The paper describes the fiber-based switching system and the measurements verifying the scheme. Stability measurements are presented for the phase-coded system. The paper also discusses the latest 8nC charge production and cathode life-time studies on Cs2Te.  
 
TUPC021 The CLIC Feasibility Demonstration in CTF3 1042
 
  • P.K. Skowroński, J. Barranco, S. Bettoni, B. Constance, R. Corsini, A.E. Dabrowski, M. Divall Csatari, S. Döbert, A. Dubrovskiy, O. Kononenko, M. Olvegård, T. Persson, A. Rabiller, F. Tecker
    CERN, Geneva, Switzerland
  • E. Adli
    University of Oslo, Oslo, Norway
  • W. Farabolini
    CEA/DSM/IRFU, France
  • R.L. Lillestol
    NTNU, Trondheim, Norway
  • T. Muranaka, A. Palaia, R.J.M.Y. Ruber
    Uppsala University, Uppsala, Sweden
 
  The objective of the CLIC Test Facility CTF3 is to demonstrate the feasibility issues of the CLIC two-beam technology: the efficient generation of a very high current drive beam, used as the power source to accelerate the main beam to multi-TeV energies with gradient over 100MeV/m, stable drive beam deceleration over long distances. Results on successful beam acceleration with over 100 MeV/m energy gain are shown. Measurements of drive beam deceleration over a chain of Power Extraction Structures are presented. The achieved RF power levels, the stability of the power production and of the deceleration are discussed. Finally, we overview the remaining issues to be shown until the end of 2011.