Author: Preger, M.A.
Paper Title Page
WEPC077 Beam Based Measurements with the Modified Wigglers in DAΦNE 2196
 
  • S. Bettoni
    CERN, Geneva, Switzerland
  • A. Drago, S. Guiducci, C. Milardi, M.A. Preger, P. Raimondi
    INFN/LNF, Frascati (Roma), Italy
 
  A novel idea to minimize the odd high order non-linearities in periodic magnets has been presented in other articles in the past. The optimization of this method on the wigglers of the main rings in DAΦNE has been performed by means of multipolar and tracking analysis. After the magnetic measurements on a spare wiggler confirmed the magnetic model used to optimize the DAΦNE wigglers, all the insertion devices in the main rings have been modified accordingly. In fall last year tune variation measurements as a function of closed orbit bumps around the wigglers confirmed the validity of the method. In this paper the beam based measurement results with the new configuration are discussed and compared with those obtained in the previous configurations.  
 
THPZ024 Updated Design of the Italian SuperB Factory Injection System 3738
 
  • S. Guiducci, M.E. Biagini, R. Boni, M.A. Preger, P. Raimondi
    INFN/LNF, Frascati (Roma), Italy
  • J. Brossard, O. Dadoun, P. Lepercq, C. Rimbault, A. Variola
    LAL, Orsay, France
  • A. Chancé
    CEA, Gif-sur-Yvette, France
  • J.T. Seeman
    SLAC, Menlo Park, California, USA
 
  The ultra high luminosity B-factory (SuperB) project of INFN requires a high performance and reliable injection system, providing electrons at 4 GeV and positrons at 7 GeV, to fulfill the very tight requirements of the collider. Due to the short beam lifetime, continuous injection of electrons and positrons in both HER and LER rings is necessary to keep the average luminosity at a high level. An updated version of the injection system, optimized at higher repetition frequency is presented. This scheme includes a polarized electron gun, a positron production scheme with electron/positron conversion at low energy 0.6 GeV, and a 1 GeV damping ring to reduce the injected emittance of the positron beam.  
 
THPZ003 The SuperB Project: Accelerator Status and R&D 3684
 
  • M.E. Biagini, S. Bini, R. Boni, M. Boscolo, B. Buonomo, T. Demma, E. Di Pasquale, A. Drago, L.G. Foggetta, S. Guiducci, S.M. Liuzzo, G. Mazzitelli, L. Pellegrino, M.A. Preger, P. Raimondi, U. Rotundo, C. Sanelli, M. Serio, A. Stecchi, A. Stella, S. Tomassini, M. Zobov
    INFN/LNF, Frascati (Roma), Italy
  • M.A. Baylac, O. Bourrion, J.-M. De Conto, N. Monseu, C. Vescovi
    LPSC, Grenoble, France
  • K.J. Bertsche, A. Brachmann, Y. Cai, A. Chao, M.H. Donald, R.C. Field, A.S. Fisher, D. Kharakh, A. Krasnykh, K.C. Moffeit, Y. Nosochkov, A. Novokhatski, M.T.F. Pivi, J.T. Seeman, M.K. Sullivan, S.P. Weathersby, A.W. Weidemann, U. Wienands, W. Wittmer, G. Yocky
    SLAC, Menlo Park, California, USA
  • S. Bettoni
    PSI, Villigen, Switzerland
  • A.V. Bogomyagkov, I. Koop, E.B. Levichev, S.A. Nikitin, I.N. Okunev, P.A. Piminov, D.N. Shatilov, S.V. Sinyatkin, P. Vobly
    BINP SB RAS, Novosibirsk, Russia
  • B. Bolzon, M. Esposito
    CERN, Geneva, Switzerland
  • F. Bosi
    INFN-Pisa, Pisa, Italy
  • L. Brunetti, A. Jeremie
    IN2P3-LAPP, Annecy-le-Vieux, France
  • A. Chancé
    CEA, Gif-sur-Yvette, France
  • P. Fabbricatore, S. Farinon, R. Musenich
    INFN Genova, Genova, Italy
  • E. Paoloni
    University of Pisa and INFN, Pisa, Italy
  • C. Rimbault, A. Variola
    LAL, Orsay, France
  • Y. Zhang
    IHEP Beijing, Beijing, People's Republic of China
 
  The SuperB collider project has been recently approved by the Italian Government as part of the National Research Plan. SuperB is a high luminosity (1036 cm-2 s-1) asymmetric e+e collider at the Y(4S) energy. The design is based on a “large Piwinski angle and Crab Waist” scheme already successfully tested at the DAΦNE Phi-Factory in Frascati, Italy. The project combines the challenges of high luminosity colliders and state-of-the-art synchrotron light sources, with two beams (e+ at 6.7 and e- at 4.2 GeV) with extremely low emittances and small beam sizes at the Interaction Point. As unique features, the electron beam will be longitudinally polarized at the IP and the rings will be able to ramp down to collide at the tau/charm energy threshold with one tenth the luminosity. The relatively low beam currents (about 2 A) will allow for low running (power) costs compared to similar machines. The insertion of beam lines for synchrotron radiation users is the latest feature included in the design. The lattice has been recently modified to accommodate insertion devices for X-rays production. A status of the project and a description of R&D in progress will be presented.  
 
THPZ004 DAΦNE Tune-up for the KLOE-2 Experiment 3687
 
  • C. Milardi, D. Alesini, M.E. Biagini, S. Bini, C. Biscari, R. Boni, M. Boscolo, B. Buonomo, A. Clozza, G.O. Delle Monache, T. Demma, E. Di Pasquale, G. Di Pirro, A. Drago, M. Esposito, L.G. Foggetta, A. Gallo, A. Ghigo, S. Guiducci, C. Ligi, S.M. Liuzzo, F. Marcellini, G. Mazzitelli, L. Pellegrino, M.A. Preger, L. Quintieri, P. Raimondi, R. Ricci, U. Rotundo, C. Sanelli, M. Serio, F. Sgamma, B. Spataro, A. Stecchi, A. Stella, S. Tomassini, C. Vaccarezza, M. Zobov
    INFN/LNF, Frascati (Roma), Italy
  • S. Bettoni
    PSI, Villigen, Switzerland
 
  Funding: Work supported by the EuCARD research programme within the 'Assessment of Novel Accelerator Concepts' work package (ANAC-WP11).
In its continuous evolution DAΦNE, the Frascati lepton collider, is starting a new run for the KLOE-2 experiment, an upgraded version of the KLOE one. A new interaction region, based on the high luminosity Crab-Waist collision scheme, has been designed, built and installed. Several machine subsystems have been revised according to innovative design concepts in order to improve beam dynamics. Collimators and shieldings have been upgraded in order to minimize the background rates on the detector during coasting as well as injection operation. A wide measurement campaign has been undertaken to verify and quantify the effect of the modifications and to tune-up the collider in view of the 3 years long data-taking foreseen to deliver ~5 fb-1 to the experiment.