Author: Molla, J.
Paper Title Page
MOPC135 IFMIF-EVEDA RF Power System 394
 
  • D. Regidor, A. Arriaga, J.C. Calvo, A. Ibarra, I. Kirpitchev, J. Molla, P. Méndez, A. Salom, M. Weber
    CIEMAT, Madrid, Spain
  • M. Abs, B. Nactergal
    IBA, Louvain-la-Neuve, Belgium
  • P.-Y. Beauvais, M. Desmons, A. Mosnier
    CEA/DSM/IRFU, France
  • P. Cara
    Fusion for Energy, Garching, Germany
  • S.J. Ceballos, J. de la Cruz
    Greenpower Technologies, Sevilla, Spain
  • Z. Cvetkovic, Z. Golubicic, C. Mendez
    TTI, Santander, Spain
  • J.M. Forteza, J.M. González, C.R. Isnardi
    Indra Sistemas, San Fernando de Henares, Spain
  • D. Vandeplassche
    SCK-CEN, Mol, Belgium
 
  The IFMIF/EVEDA Accelerator Prototype will be a 9 MeV, 125 mA CW deuteron accelerator to validate the technical options for the IFMIF accelerator design. The Radiofrequency Quadrupole (RFQ), buncher cavities and Superconducting Radiofrequency Linac (SRF Linac) require continuous wave RF power at 175 MHz with an accuracy of ±1% in amplitude and ±1° in phase. Also the IFMIF/EVEDA RF Power System has to work under pulsed mode operation (during the accelerator commissioning). The IFMIF/EVEDA RF Power System is composed of 18 RF power generators feeding the eight RFQ couplers (200 kW), the two buncher cavities (105 kW) and the eight superconducting half wave resonators of the SRF Linac (105 kW). The main components of each RF power chain are the Low Level Radio Frequency system (LLRF), three amplification stages and a circulator with its load. For obvious standardization and scale economies reasons, the same topology has been chosen for the 18 RF power chains: all of them use the same main components which can be individually tuned to provide different RF output powers up to 200 kW. The studies and the current design of the IFMIF/EVEDA RF Power System are presented in this contribution.  
 
THPS060 RAM Methodology and Activities for IFMIF Engineering Design 3565
 
  • J.M. Arroyo, A. Ibarra, J. Molla
    CIEMAT, Madrid, Spain
  • J. Abal, E. Bargalló, J. Dies, C. Tapia
    UPC, Barcelona, Spain
 
  IFMIF will be an accelerator-based neutron source to test fusion candidate materials. The Engineering Validation and Engineering Design Activities of IFMIF are aimed to deliver the complete engineering design file of this major facility. Achieving a high level of availability and reliability is a key point for IFMIF mission. A goal of 70% of operational availability has been established. In order to fulfill the availability requirements, RAM has to be considered during the engineering design phase. This paper summarizes the methodology developed and the proposed process aimed at including RAM in the design of IFMIF, as well as the activities performed in this framework. Overall RAM specifications have been defined for IFMIF project. RAM methodology dealing with RAM design guidelines, reliability database and RAM modelization has been developed. As a first step for the iterative process of RAM analysis of IFMIF design, a fault tree model based on a new reliability database has been performed with Risk Spectrum®. The result is a first assessment of the availability and first allocation of RAM requirements.