Author: Jenner, L.J.
Paper Title Page
MOPZ004 Studies for the PRISM FFAG Ring for the Next Generation Muon to Electron Conversion Experiment 826
 
  • J. Pasternak
    STFC/RAL, Chilton, Didcot, Oxon, United Kingdom
  • M. Aslaninejad, L.J. Jenner, A. Kurup, J. Pasternak, Y. Shi, Y. Uchida
    Imperial College of Science and Technology, Department of Physics, London, United Kingdom
  • R.J. Barlow
    UMAN, Manchester, United Kingdom
  • K.M. Hock, B.D. Muratori
    Cockcroft Institute, Warrington, Cheshire, United Kingdom
  • D.J. Kelliher, S. Machida, C.R. Prior
    STFC/RAL/ASTeC, Chilton, Didcot, Oxon, United Kingdom
  • Y. Kuno, A. Sato
    Osaka University, Osaka, Japan
  • J.-B. Lagrange, Y. Mori
    KURRI, Osaka, Japan
  • M. Lancaster
    UCL, London, United Kingdom
  • C. Ohmori
    KEK, Tokai, Ibaraki, Japan
  • T. Planche
    TRIUMF, Canada's National Laboratory for Particle and Nuclear Physics, Vancouver, Canada
  • S.L. Smith
    STFC/DL/ASTeC, Daresbury, Warrington, Cheshire, United Kingdom
  • H. Witte, T. Yokoi
    JAI, Oxford, United Kingdom
 
  High intensity and high quality muon beams are needed for the next generation lepton flavour violation experiments. Such beams can be produced by sending a short proton pulse to a pion production target, capturing the pions and performing RF phase rotation on the resulting muon beam in an FFAG ring. Such a solution was proposed for the PRISM project and this paper summarizes its current status. In particular the PRISM task force was created to address the accelerator and detector issues that need to be solved in order to realise the PRISM experiment. Alternative designs for the PRISM FFAG ring are discussed and their performance compared. The injection/extraction systems and matching to the solenoid channels upstream and downstream of the FFAG ring are presented. The future direction for the study will be outlined.  
 
WEPS103 Design of a Rapid Cycling Synchrotron for the Final Stage of Acceleration in a Common Proton Driver for a Neutrino Factory and a Spallation Neutron Source Based on Megawatt Upgrades to ISIS 2751
 
  • J. Pasternak
    STFC/RAL, Chilton, Didcot, Oxon, United Kingdom
  • L.J. Jenner, J. Pasternak
    Imperial College of Science and Technology, Department of Physics, London, United Kingdom
 
  Potential upgrades to the ISIS accelerators at RAL in the UK to provide proton beams in the few GeV and few MW range could be envisaged as the starting point for a proton driver shared between a short pulse spallation neutron source and the Neutrino Factory. The accelerator chain for the spallation neutron source, consisting of an 800 MeV H linac and a 3.2 GeV rapid cycling synchrotron (RCS), is currently being designed and optimised. The design of the RCS for the final stage of acceleration, which would increase the final beam energy of the dedicated pulses to feed the Neutrino Factory pion production target is presented. The feasibility of the final bunch compression to the necessary nanosecond range is also discussed.