Author: Hogan, J.
Paper Title Page
MOPC112 Fabrication and Testing Status of CEBAF 12 GeV Upgrade Cavities 337
 
  • F. Marhauser, A. Burrill, G.K. Davis, D. Forehand, C. Grenoble, J. Hogan, R.B. Overton, A.V. Reilly, R.A. Rimmer, M. Stirbet
    JLAB, Newport News, Virginia, USA
 
  Funding: Authored by Jefferson Science Associates, LLC under U.S. DOE Contract No. DE-AC05-06OR23177.
The 12 GeV upgrade of the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Laboratory (JLab) is under way. All cavities have been built by industry and are presently undergoing post-processing and final low and high power qualification before cryomodule assembly. The status is reported including fabrication-related experiences, observations and issues throughout production, post-processing and qualification.