Author: Hasegawa, T.
Paper Title Page
TUPS012 The Present Status of Vacuum System of XFEL in SPring-8 1542
 
  • T. Bizen
    RIKEN SPring-8 Center, Sayo-cho, Sayo-gun, Hyogo, Japan
  • T. Hasegawa
    RIKEN/SPring-8, Hyogo, Japan
 
  The vacuum component assembly and installation were completed by February in 2011. The total length of the vacuum system is about 630 m. A 455 sputter ion pumps and a 108 NEG cartridge pumps generate vacuum. The average pressures are on the order of ·10-7 Pa or less. The flange developed for C-band waveguide shows high reliability of vacuum seal.