Author: Gentini, L.
Paper Title Page
TUPS035 LHC Collimators with Embedded Beam Position Monitors: A New Advanced Mechanical Design 1611
 
  • A. Dallocchio, A. Bertarelli, C.B. Boccard, F. Carra, M. Gasior, L. Gentini, M.A. Timmins
    CERN, Geneva, Switzerland
 
  The LHC collimation system, ensuring both functions of beam cleaning and machine protection, is potentially submitted to high-energy beam impacts. Currently the collimators setup is performed by monitoring beam losses generated by the collimator jaws when approaching the particle beam. This procedure is applied to all LHC collimators (almost one hundred), taking several hours, and needs to be repeated if beam settings change significantly. Furthermore, during the beam-based alignment, the LHC tertiary collimators are potentially exposed to abnormal losses entailing possible damage to their tungsten jaws. To improve the efficiency of the machine operation and better control the particle beam a new advanced design embedding Beam Position Monitors (BPM) into the movable collimator jaws has been developed. This paper describes the mechanical design of various types of future collimators with embedded BPMs. Experimental measurements performed on a simplified functional prototype installed in the CERN SPS showed that, thanks to on-board BPMs, the collimator could be precisely, rapidly, and safely aligned and the beam position accurately measured.  
 
TUPS100 Manufacturing the Linac4 PI-mode Structure Prototype at CERN 1774
 
  • G. Favre, A. Cherif, A. Dallocchio, J.-M. Geisser, L. Gentini, F. Gerigk, S.J. Mathot, M. Polini, S. Sgobba, T. Tardy, R. Wegner
    CERN, Geneva, Switzerland
 
  The PI-Mode Structure (PIMS) of Linac4 consists of 7-cell cavities made from alternating OFE copper discs and rings welded together with electron beam (EB) welding. A full-scale prototype cavity of almost 1.5 m in length has been manufactured, assembled, and tested at CERN to prepare the series production of 12 PIMS cavities as part of an international collaboration. This paper reports on the construction experience including machining operations, EB welding, vacuum brazing, and metrological measurements results.