Paper | Title | Page |
---|---|---|
TUPZ012 | Machine-induced Showers entering the ATLAS and CMS Detectors in the LHC | 1825 |
|
||
One source of experimental background in the LHC is showers induced by particles hitting the upstream collimators or particles that have been scattered on the residual gas. We estimate the flux and distribution of particles entering the ATLAS and CMS detectors through FLUKA simulations originating from tertiary collimator hits and inelastic beam-gas interactions. Comparisons to MARS results are also presented. | ||
WEPC173 | LHC Magnet Quench Test with Beam Loss Generated by Wire Scan | 2391 |
|
||
Beam losses with millisecond duration have been observed in the LHC in 2010 and 2011. They are expected to be provoked by dust particles falling into the beam. These losses could compromise the LHC availability if they provoke quenches of superconducting magnets. In order to investigate the quench limits for this loss mechanism, a quench test using the wire scanner has been performed, with the wire movement through the beam mimicking a loss with similar spatial and temporal distribution as in the case of dust particles. This paper will show the conclusions reached for millisecond-duration dust-provoked quench limits. It will include details on the maximum energy deposited in the coil as estimated using FLUKA code, showing good agreement with quench limit estimated from the heat transfer code QP3. In addition, information on the damage limit for carbon wires in proton beams will be presented, following electron microscope analysis which revealed strong wire sublimation. | ||
THPZ032 | Evaluation of the Combined Betatron and Momentum Cleaning in Point 3 in Terms of Cleaning Efficiency and Energy Deposition for the LHC Collimation Upgrade | 3762 |
|
||
Funding: This work has been carried out through of the European Coordination for Accelerator Research and Development (EuCARD), co-sponsored by EU 7th Framework Program. The Phase I LHC Collimation System Upgrade could include moving part of the Betatron Cleaning from LHC Point 7 to Point 3 to improve both operation flexibility and intensity reach. In addition, the partial relocation of beam losses from the current Betatron cleaning region at Point 7 will mitigate the risks of Single Event Upsets to equipment installed in adjacent and partly not adequate shielded areas. A combined Betatron and Momentum Cleaning scenario at Point 3 implies the installation of new collimators and a new collimator aperture layout. This paper shows the whole LHC Collimator Efficiency variation with the new layout proposed at different beam energies. As part of the evaluation, energy deposition distribution in the IR3 region gives indications about the effect of this new implementation not only on the collimators themselves but also on the other beam line elements. |
||