Results of the Nuclotron Upgrade Program |
2508 |
|
- A.V. Eliseev, N.N. Agapov, A.V. Alfeev, V. Andreev, V. Batin, D.E. Donets, E.D. Donets, E.E. Donets, E.V. Gorbachev, A. Govorov, V. Karpinsky, V.D. Kekelidze, H.G. Khodzhibagiyan, A. Kirichenko, A.D. Kovalenko, O.S. Kozlov, N.I. Lebedev, I.N. Meshkov, V.A. Mikhailov, V. Monchinsky, S. Romanov, T.V. Rukoyatkina, A.O. Sidorin, I. Slepnev, V. Slepnev, A.V. Smirnov, A. Sorin, G.V. Trubnikov, B. Vasilishin
JINR, Dubna, Moscow Region, Russia
- O.I. Brovko, A.V. Butenko, N.V. Semin, V. Volkov
JINR/VBLHEP, Moscow, Russia
|
|
|
The Nuclotron upgrade – the Nuclotron-M project, which had been started in 2007, involved the modernization of almost all of the accelerator systems, using beam time during seven runs devoted to testing newly installed equipment. Following the project goals, in March 2010 Xe ions were accelerated to about 1.5 GeV/u. In December 2010, the stable and safe operation of the magnetic system was achieved with a main field of 2 T. The successful completion of the project paves the way for further development of the Nuclotron-based Ion Collider fAcility (NICA).
|
|
|
WEPS014 |
RF Systems and Bunch Formation at NICA |
2511 |
|
- A.V. Eliseev, I.N. Meshkov, A.O. Sidorin, G.V. Trubnikov
JINR, Dubna, Moscow Region, Russia
- O.I. Brovko
JINR/VBLHEP, Moscow, Russia
- G.Y. Kurkin, V.M. Petrov
BINP SB RAS, Novosibirsk, Russia
|
|
|
The NICA facility being constructed at JINR will consists of two synchrotrons (Booster and Nuclotron) and collider working at constant magnetic field. To reach required luminosity level the collider rings will be operated with short ion bunches. The bunch formation in the collider as well as longitudinal dynamics in all the rings is described. The parameters and preliminary design of RF systems are presented.
|
|
|
THPS046 |
Transport Beam Lines for NICA Accelerator Complex |
3526 |
|
- O.S. Kozlov, A.V. Eliseev, I.N. Meshkov, V.A. Mikhailov, A.O. Sidorin, N.D. Topilin, G.V. Trubnikov, A. Tuzikov
JINR, Dubna, Moscow Region, Russia
|
|
|
In the last years Nuclotron-based Ion Collider fAcility (NICA) project is being developed by Joint Institute for Nuclear Research (JINR), Dubna, Russia. The goal of the project is to construct new accelerator complex that will be used for colliding ion beams on first stage and colliding polarized proton/deuteron beams on second stage of the project. NICA accelerator complex will consist of two linear accelerators, two superconducting synchrotrons, two superconducting storage rings of the collider and transport beamlines. Geometry and magnetic system of NICA beamlines are presented in this report. Results of beam dynamics simulations within the beamlines are considered.
|
|
|