Author: Carli, C.
Paper Title Page
TUOAA03 The Linac4 Project at CERN 900
 
  • M. Vretenar, L. Arnaudon, P. Baudrenghien, C. Bertone, Y. Body, J.C. Broere, O. Brunner, M.C.L. Buzio, C. Carli, F. Caspers, J.-P. Corso, J. Coupard, A. Dallocchio, N. Dos Santos, R. Garoby, F. Gerigk, L. Hammouti, K. Hanke, M.A. Jones, I. Kozsar, J.-B. Lallement, J. Lettry, A.M. Lombardi, L.A. Lopez Hernandez, C. Maglioni, S.J. Mathot, S. Maury, B. Mikulec, D. Nisbet, C. Noels, M.M. Paoluzzi, B. Puccio, U. Raich, S. Ramberger, C. Rossi, N. Schwerg, R. Scrivens, G. Vandoni, J. Vollaire, S. Weisz, Th. Zickler
    CERN, Geneva, Switzerland
 
  As the first step of a long-term programme aiming at an increase in the LHC luminosity, CERN is building a new 160 MeV H linear accelerator, Linac4, to replace the ageing 50 MeV Linac2 as injector to the Proton-Synchrotron Booster (PSB). Linac4 is an 86-m long normal-conducting linac made of an H source, a Radio Frequency Quadrupole (RFQ), a chopping line and a sequence of three accelerating structures: a Drift-Tube Linac (DTL), a Cell-Coupled DTL (CCDTL) and a Pi-Mode Structure (PIMS). The civil engineering has been recently completed, and construction of the main accelerator components has started with the support of a network of international collaborations. The low-energy section up to 3 MeV including a 3-m long 352 MHz RFQ entirely built at CERN is in the final construction phase and is being installed on a dedicated test stand. The present schedule foresees beam commissioning of the accelerator in the new tunnel in 2013/14; the moment of connection of the new linac to the CERN accelerator chain will depend on the LHC schedule for long shut-downs.  
slides icon Slides TUOAA03 [10.347 MB]  
 
TUPZ016 First Run of the LHC as a Heavy-ion Collider 1837
 
  • J.M. Jowett, G. Arduini, R.W. Assmann, P. Baudrenghien, C. Carli, M. Lamont, M. Solfaroli Camillocci, J.A. Uythoven, W. Venturini Delsolaro, J. Wenninger
    CERN, Geneva, Switzerland
 
  A year of LHC operation typically consists of an extended run with colliding protons, ending with a month in which the LHC has to switch to its second role as a heavy ion collider and provide a useful integrated luminosity to three experiments. The first such run in November 2010 demonstrated that this is feasible. Commissioning was extremely rapid, with collisions of Pb nuclei achieved within 55 h of first injection. Stable beams for physics data-taking were declared a little over one day later and the final integrated luminosity substantially exceeded expectations.  
 
WEPS019 Study of a Rapid Cycling Synchrotron to Replace the CERN PS Booster 2523
 
  • K. Hanke, O. Aberle, M. E. Angoletta, B. Balhan, W. Bartmann, M. Benedikt, J. Borburgh, D. Bozzini, C. Carli, P. Dahlen, T. Dobers, M. Fitterer, R. Garoby, S.S. Gilardoni, B. Goddard, J. Hansen, T. Hermanns, M. Hourican, S. Jensen, A. Kosmicki, L.A. Lopez Hernandez, M. Meddahi, B. Mikulec, A. Newborough, M. Nonis, S. Olek, M.M. Paoluzzi, S. Pittet, B. Puccio, V. Raginel, I. Ruehl, H.O. Schönauer, L. Sermeus, R.R. Steerenberg, J. Tan, J. Tückmantel, M. Vretenar, M. Widorski
    CERN, Geneva, Switzerland
 
  CERN’s proton injector chain is undergoing a massive consolidation and upgrade program in order to deliver beams meeting the needs of the LHC Luminosity Upgrade. As an alternative to the upgrade of the existing Proton Synchrotron Booster (PSB), the construction of a Rapid Cycling Synchrotron (RCS) has been studied. This machine would replace the PSB and deliver beams to the LHC as well as to CERN’s rich fixed-target physics program. This paper summarizes the outcome of the feasibility study along with a tentative RCS design.  
 
WEPS022 Ions for LHC: Performance of the Injector Chain 2529
 
  • D. Manglunki, M. E. Angoletta, P. Baudrenghien, G. Bellodi, A. Blas, T. Bohl, C. Carli, E. Carlier, S. Cettour Cave, M. Chanel, K. Cornelis, H. Damerau, A. Findlay, S.S. Gilardoni, S. Hancock, J.M. Jowett, D. Kuchler, S. Maury, E. Métral, S. Pasinelli, M. Schokker, G. Tranquille, B. Vandorpe, U. Wehrle, J. Wenninger
    CERN, Geneva, Switzerland
 
  The first LHC Pb ion run took place at 1.38 A TeV/c per beam in autumn 2010. After a short period of running-in, the injector chain was able to fill the collider with up to 137 bunches per ring, with an intensity of 108 Pb ions/bunch, about 50% higher than the design value. This yielded a luminosity of 3E25 Hz/cm2, allowing the experiments to accumulate just under 10 inverse microbarn each during the four week run. We review the performance of the individual links of the injector chain, and address the main issues limiting the LHC luminosity, in view of reaching 1026 Hz/cm2 in 2011, and substantially beyond when the LHC energy increases after the long shutdown in 2013-14.  
 
WEPS101 Lattice Design of a RCS as Possible Alternative to the PS Booster Upgrade 2745
 
  • M. Fitterer, M. Benedikt, H. Burkhardt, C. Carli, R. Garoby, B. Goddard, K. Hanke, H.O. Schönauer
    CERN, Geneva, Switzerland
  • A.-S. Müller
    KIT, Karlsruhe, Germany
 
  In the framework of the LHC Injectors Upgrade (LIU) a new rapid cycling synchrotron as alternative to the PS Booster has been proposed. In this paper we present the lattice constraints and requirement as well as the current status of the RCS lattice design and beam dynamics studies.  
 
WEPS018 The Proposed CERN Proton-Synchrotron Upgrade Program 2520
 
  • S.S. Gilardoni, S. Bart Pedersen, W. Bartmann, S. Bartolome, O.E. Berrig, C. Bertone, A. Blas, D. Bodart, J. Borburgh, R.J. Brown, A.C. Butterworth, M.C.L. Buzio, C. Carli, P. Chiggiato, H. Damerau, T. Dobers, R. Folch, R. Garoby, B. Goddard, M. Gourber-Pace, S. Hancock, M. Hourican, P. Le Roux, L.A. Lopez Hernandez, A. Masi, G. Metral, Y. Muttoni, E. Métral, M. Nonis, J. Pierlot, S. Pittet, C. Rossi, I. Ruehl, G. Rumolo, L. Sermeus, R.R. Steerenberg, M. Widorski
    CERN, Geneva, Switzerland
 
  In the framework of the High-Luminosity LHC project, the CERN Proton Synchrotron would require a major upgrade to match the future beam parameters requested as pre-injector of the collider. The different beam dynamics issues, from space-charge limitations to longitudinal instabilities are discussed, as well as the proposed technical solutions to overcome them, covering the increase of the injection energy to RF related improvements.  
 
WEPS020 Study of an Energy Upgrade of the CERN PS Booster 2526
 
  • K. Hanke, O. Aberle, M. E. Angoletta, W. Bartmann, S. Bartolome, C. Bertone, A. Blas, J. Borburgh, D. Bozzini, A.C. Butterworth, C. Carli, P. Dahlen, T. Dobers, A. Findlay, R. Folch, N. Gilbert, J. Hansen, T. Hermanns, S. Jensen, P. Le Roux, L.A. Lopez Hernandez, E. Mahner, A. Masi, B. Mikulec, Y. Muttoni, A. Newborough, D. Nisbet, M. Nonis, S. Olek, M.M. Paoluzzi, S. Pittet, B. Puccio, V. Raginel, I. Ruehl, J. Tan, B. Todd, W.J.M. Weterings, M. Widorski
    CERN, Geneva, Switzerland
 
  CERN’s LHC injector chain will have to deliver beams with ultimate brilliance as the LHC is heading for increased luminosity in the coming years. In order to overcome bottlenecks in the injector chain, an increase of the beam transfer energy from the CERN Proton Synchrotron Booster (PSB) to the Proton Synchrotron (PS) has been investigated as a possible upgrade scenario. This paper gives an overview of the technical solutions and summarizes the conclusions of the feasibility study.  
 
THPS052 Studies on Transverse Painting for H Injection into the PSB 3544
 
  • C. Bracco, C. Carli, T. Fowler, B. Goddard, G. Gräwer, J.-B. Lallement, M. Martini, M. Scholz, W.J.M. Weterings
    CERN, Geneva, Switzerland
 
  Linac4 will inject 160 MeV H− ions in to the CERN PS Booster (PSB). This will allow to reduce space charge effects and increase beam intensity but will require a substantial upgrade of the injection region, with the implementation of a charge-exchange multi-turn injection scheme. The PSB has to provide beam to several users with different requirements in terms of beam intensity and emittance. Four kicker magnets (KSW), which are already installed in the PSB lattice, will be used to accomplish painting in the horizontal phase space to match the injected beams to the required emittances. Double linear functions, with varying slopes for each user, have been defined for the KSW generators waveforms according to detailed beam dynamic studies for all target intensities and emittances. Effect of space charge, injection offsets, dispersion and betatron mismatch have been taken into account. Preliminary studies have been carried out to evaluate how to obtain the required vertical emittance and the option of a transverse painting, also in the vertical plane, is explored.