Author: Cao, Y.
Paper Title Page
TUPS090 Operation Status of SECRAL at IMP 1750
 
  • W. Lu, Y. Cao
    Graduate School of the Chinese Academy of Sciences, Beijing, People's Republic of China
  • Y.C. Feng, X.H. Guo, W. Lu, L.T. Sun, D. Xie, X.Z. Zhang, H.W. Zhao
    IMP, Lanzhou, People's Republic of China
 
  SECRAL (Superconducting ECR ion source with Advanced design in Lanzhou) is a fully superconducting ECR ion source built in 2005 with an innovative solenoid-inside-sextupole structure. Since then it has delivered many highly-charged ion beams for HIRFL (Heavy Ion Research Facility in Lanzhou) at IMP (Institute of Modern Physics), such as Xe27+,Kr19+,Bi36+ and Ni19+, and its on-line operating time increases year by year. By January 2011, the operation time of SECRAL has totaled up to 5700 hours. The increasing demand for intensive highly-charged ion beams has lead to the continuous enhancement of the SECRAL. To meet the requirement for stable highly-charged metallic ion beams, double-frequency of 18 GHz + 24 GHz heating with an off-axis oven had been carried out in 2010. 60-80 euA of Bi36+ were produced at microwave power of about 2 kW and had been delivered continuously to HIRFL for about 10 days without any breakdowns. A number of improvements were planned to further improve the long-term stability of metallic ion beams.