Author: Apyan, A.
Paper Title Page
TUPC027 CLIC Post-Collision Line Luminosity Monitoring 1057
 
  • R. Appleby
    UMAN, Manchester, United Kingdom
  • A. Apyan, L.C. Deacon, E. Gschwendtner
    CERN, Geneva, Switzerland
 
  The CLIC post collision line is designed to transport the un-collided beams and the products of the collided beams with a total power of 14 MW to the main beam dump. Full Monte Carlo simulation has been done for the description of the Compact Linear Collider (CLIC) luminosity monitoring at the post collision line. One method of the luminosity diagnostic is based on the detection of high energy muons produced by the beamsstrahlung photons in the main beam dump. The disrupted beam and the beamsstrahlung photons produce at the order of 106 muons per bunch crossing, with energies greater than 10 GeV. Currently threshold Cherenkov counters are considered after the beam dump for the detection of these high energy muons. A second method using the direct detection of the beamsstrahlung photons is also considered.