JACoW is a publisher in Geneva, Switzerland that publishes the proceedings of accelerator conferences held around the world by an international collaboration of editors.
TY - CONF AU - Pavis, S. AU - Barlow, R.A. AU - Boucly, C. AU - Carlier, E. AU - Chanavat, C. AU - Lolliot, C.A. AU - Magnin, N. AU - Van Trappen, P. AU - Voumard, N. ED - Schaa, Volker RW ED - Götz, Andy ED - Venter, Johan ED - White, Karen ED - Robichon, Marie ED - Rowland, Vivienne TI - A Modular Approach for Accelerator Controls Components Deployment for High Power Pulsed Systems J2 - Proc. of ICALEPCS2023, Cape Town, South Africa, 09-13 October 2023 CY - Cape Town, South Africa T2 - International Conference on Accelerator and Large Experimental Physics Control Systems T3 - 19 LA - english AB - As part of the LHC Injector Upgrade (LIU) project, the controls of the PSB and PS injection kickers at CERN have been upgraded during Long Shutdown 2 (LS2) from heterogeneous home-made electronic solutions to a modular and open architecture. Despite both kickers have significantly different functionalities, topologies and operational requirements, standardized hardware and software control blocks have been used for both systems. The new control architecture is built around a set of sub-systems, each one with a specific generic function required for the control of fast pulsed systems such as equipment and personnel safety, slow control and protection, high precision fast timing system, fast interlocking and protection, pulsed signal acquisition and analysis. Each sub-system comprises a combined integration of hardware components and associated low level software. This paper presents the functionality of the different sub-systems, illustrates how they have been integrated for the two different use-cases, discusses the lessons learned from these first implementations and identifies possible evolution in view of deployment in other installations during Long Shutdown 3 (LS3). PB - JACoW Publishing CP - Geneva, Switzerland SP - 788 EP - 792 KW - controls KW - kicker KW - timing KW - operation KW - power-supply DA - 2024/02 PY - 2024 SN - 2226-0358 SN - 978-3-95450-238-7 DO - doi:10.18429/JACoW-ICALEPCS2023-TUPDP101 UR - https://jacow.org/icalepcs2023/papers/tupdp101.pdf ER -