Title |
ITER Controls Approaching One Million Integrated EPICS Process Variables |
Authors |
- A. Wallander, B. Bauvir
ITER Organization, St. Paul lez Durance, France
|
Abstract |
The ITER Tokamak is currently being assembled in southern France. In parallel, the supporting systems have completed installation and are under commissioning or operation. Over the last couple of years the electrical distribution, building services, liquid & gas, cooling water, reactive power compensation and cryoplant have been integrated, adding up to close to one million process variables. Those systems are operated, or under commissioning, from a temporary main control room or local control rooms close to the equipment using an integrated infrastructure. The ITER control system is therefore in production. As the ITER procurement is 90% in-kind, a major challenge has been the integration of the various systems provided by suppliers from the ITER members. Standardization, CODAC Core System software distribution, training and coaching have all played a positive role. Nevertheless, the integration has been more difficult than foreseen and the central team has been forced to rework much of the delivered software. In this paper we report on the current status of the ITER integrated control system with emphasize on lessons learned from integration of in-kind contributions.
|
Paper |
download MO1BCO02.PDF [0.586 MB / 6 pages] |
Slides |
download MO1BCO02_TALK.PDF [3.516 MB] |
Cite |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
Conference |
ICALEPCS2023 |
Series |
International Conference on Accelerator and Large Experimental Physics Control Systems (19th) |
Location |
Cape Town, South Africa |
Date |
09-13 October 2023 |
Publisher |
JACoW Publishing, Geneva, Switzerland |
Editorial Board |
Volker RW Schaa (GSI, Darmstadt, Germany); Andy Götz (ESRF, Grenoble, France); Johan Venter (SARAO, Cape Town, South Africa); Karen White (SNS, Oak Ridge, TN, USA); Marie Robichon (ESRF, Grenoble, France); Vivienne Rowland (SARAO, Cape Town, South Africa) |
Online ISBN |
978-3-95450-238-7 |
Online ISSN |
2226-0358 |
Received |
27 September 2023 |
Revised |
07 October 2023 |
Accepted |
15 November 2023 |
Issued/td>
| 07 December 2023 |
DOI |
doi:10.18429/JACoW-ICALEPCS2023-MO1BCO02 |
Pages |
6-11 |
Copyright |
Published by JACoW Publishing under the terms of the Creative Commons Attribution 4.0 International license. Any further distribution of this work must maintain attribution to the author(s), the published article's title, publisher, and DOI. |
|