Paper |
Title |
Page |
THPV031 |
Upgrade of Timing System at HZDR ELBE Facility |
931 |
|
- Ž. Oven, L. Krmpotić, U. Legat, U. Rojec
Cosylab, Ljubljana, Slovenia
- M. Justus, M. Kuntzsch, A. Schwarz, K. Zenker
HZDR, Dresden, Germany
|
|
|
The ELBE center for high power radiation sources is operating an electron linear accelerator to generate various secondary radiation like neutrons, positrons, intense THz and IR pulses and Bremsstrahlung. Timing system, that is currently in operation, has been modified and extended in the last two decades to enable new experiments. At the moment parts of this timing system are using obsolete components which makes maintenance a very challenging endeavour. To make ELBE timing system again a more homogenous system, that will allow for easier adaption to new and more complex trigger patterns, an upgrade based on Micro Research Finland (MRF) hardware platform is currently in progress. This upgrade will enable parallel operation of two electron sources and subsequent kickers to serve multiple end stations at the same time. Selected hardware enables low jitter emission of timing patterns and a long-term delay compensation of the distribution network. We are currently in the final phase of development and with plans for commissioning to be completed in 2022.
|
|
|
Poster THPV031 [2.801 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-ICALEPCS2021-THPV031
|
|
About • |
Received ※ 11 October 2021 Revised ※ 20 October 2021
Accepted ※ 21 November 2021 Issue date ※ 11 January 2022 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|