JACoW logo

Journals of Accelerator Conferences Website (JACoW)

JACoW is a publisher in Geneva, Switzerland that publishes the proceedings of accelerator conferences held around the world by an international collaboration of editors.


BiBTeX citation export for THPV029: Development of Timing Read-Back System for Stable Operation of J-PARC

@inproceedings{yang:icalepcs2021-thpv029,
  author       = {M. Yang and N. Kamikubota and N. Kikuzawa and K.C. Sato and Y. Tajima},
  title        = {{Development of Timing Read-Back System for Stable Operation of J-PARC}},
  booktitle    = {Proc. ICALEPCS'21},
  pages        = {927--930},
  eid          = {THPV029},
  language     = {english},
  keywords     = {timing, operation, LLRF, proton, controls},
  venue        = {Shanghai, China},
  series       = {International Conference on Accelerator and Large Experimental Physics Control Systems},
  number       = {18},
  publisher    = {JACoW Publishing, Geneva, Switzerland},
  month        = {03},
  year         = {2022},
  issn         = {2226-0358},
  isbn         = {978-3-95450-221-9},
  doi          = {10.18429/JACoW-ICALEPCS2021-THPV029},
  url          = {https://jacow.org/icalepcs2021/papers/thpv029.pdf},
  abstract     = {{Since 2006, the Japan Proton Accelerator Research Complex (J-PARC) timing system has been operated successfully. However, there were some unexpected trig-ger-failure events, typically missing trigger events, during the operation over 15 years. When a trigger-failure event occurred, it was often tough to find the one with the fault among many suspected modules. To solve the problem more easily, a unique device, triggered scaler, was devel-oped for reading back accelerator signals. The performance of the module has been evaluated in 2018. In 2021, we measured and observed an LLRF sig-nal as the first signal of the read-back system for beam operation. After firmware upgrades of the module, some customized timing read-back systems were developed, and successfully demonstrated as coping strategies for past trigger-failure events. In addition, a future plan to apply the read-back system to other facilities is discussed. More details are given in the paper.}},
}